Difference between revisions of "Run Coordination Meetings:Spring2019 Run"

From GlueXWiki
Jump to: navigation, search
(Hall D situation room (current run plan))
(Beam and Hall configuration)
Line 29: Line 29:
  
 
* Beam energy expected:  
 
* Beam energy expected:  
** 11.640 GeV (same value as Fall 2016 to Fall 2018 up Nov. 15th).
+
** 11.630 GeV (10 MeV less than value for Fall 2016 to Fall 2018 up Nov. 15th, due to imbalanced linac setting).
 
* Solenoid:
 
* Solenoid:
 
**DIRC commissioning: <font color="blue"><b>1350A </b></font>  
 
**DIRC commissioning: <font color="blue"><b>1350A </b></font>  
Line 36: Line 36:
 
** 250 MHz frequency.  
 
** 250 MHz frequency.  
 
** Range:  
 
** Range:  
***DIRC commissioning: 1 nA-1.2 μA.  
+
***DIRC commissioning: 50 nA-1.2 μA.  
 
***PrimEx-eta run: 1 nA-<font color="red">500 nA. ??</font>
 
***PrimEx-eta run: 1 nA-<font color="red">500 nA. ??</font>
** Chopper slit: shared with Hall A until 03/10/2019. Then alone on slit A.   
+
** Chopper slit: shared with Hall C until 03/10/2019. Then alone on slit A.   
 
**Standard current and radiators
 
**Standard current and radiators
 
*** DIRC: Standard commissioning current: <font color="blue"><b>225 nA </b></font> on 1.4&middot;10<sup>-4</sup> R.L. radiator (JD70-104 17 μm diamond).  
 
*** DIRC: Standard commissioning current: <font color="blue"><b>225 nA </b></font> on 1.4&middot;10<sup>-4</sup> R.L. radiator (JD70-104 17 μm diamond).  
 
*** DIRC: Hight intensity tests: 1.2 μA on 1.4&middot;10<sup>-4</sup> R.L. radiator (JD70-104 17 μm diamond) (or 0.5 μA on JD70-105, 47 μm diamond of 3.9&middot;10<sup>-4</sup> R.L.)
 
*** DIRC: Hight intensity tests: 1.2 μA on 1.4&middot;10<sup>-4</sup> R.L. radiator (JD70-104 17 μm diamond) (or 0.5 μA on JD70-105, 47 μm diamond of 3.9&middot;10<sup>-4</sup> R.L.)
***PrimEx-eta run: Standard production on LH2: <font color="red">100 nA. ??</font> on 30 &micro;m Al (33.7&middot;10<sup>-5</sup> R.L.)
+
***PrimEx-eta run: Standard production on <font color="magenta"><b><sup>4</sup>He: 320 nA. </b></font> on 10 &micro;m Al (11.2&middot;10<sup>-5</sup> R.L.)
***PrimEx-eta run: Standard production on Be: <font color="red">30 nA. ??</font> on 30 &micro;m Al (33.7&middot;10<sup>-5</sup> R.L.)
+
***PrimEx-eta run: Standard production on <font color="magenta"><b>Be: 30 nA.</b></font> on 30 &micro;m Al (33.7&middot;10<sup>-5</sup> R.L.)
 
** RSAD limit for most of the run, excluding high intensity tests: <font color="red">?? nA on ??&middot;10<sup>-4</sup> R.L. radiator.</font>
 
** RSAD limit for most of the run, excluding high intensity tests: <font color="red">?? nA on ??&middot;10<sup>-4</sup> R.L. radiator.</font>
 
* Position Slow Lock on or FFB on (FFB doesn't operate below 50nA).   
 
* Position Slow Lock on or FFB on (FFB doesn't operate below 50nA).   
Line 56: Line 56:
 
**Amorphous
 
**Amorphous
 
*** 1.64 &micro;m Al (1.86&middot;10<sup>-5</sup> R.L., see [https://logbooks.jlab.org/entry/3631428 study])
 
*** 1.64 &micro;m Al (1.86&middot;10<sup>-5</sup> R.L., see [https://logbooks.jlab.org/entry/3631428 study])
*** 10 &micro;m Al (11.2&middot;10<sup>-5</sup> R.L.)
+
*** <font color="magenta"><b> 10 &micro;m Al (11.2&middot;10<sup>-5</sup> R.L.)
*** <font color="magenta"><b> 30 &micro;m Al </b>  (33.7&middot;10<sup>-5</sup> R.L.)</font>
+
*** 30 &micro;m Al </b>  (33.7&middot;10<sup>-5</sup> R.L.)</font>
  
 
*Tagger quadrupole on (-4.2 A).  
 
*Tagger quadrupole on (-4.2 A).  
Line 65: Line 65:
 
* Targets:  
 
* Targets:  
 
**LH2 target: [https://hdops.jlab.org/wiki/index.php/Cryogenic_Target_Shift cryogenic target]
 
**LH2 target: [https://hdops.jlab.org/wiki/index.php/Cryogenic_Target_Shift cryogenic target]
**Be target <font color="red">?? mm,  ??&middot;10<sup>-4</sup> R.L. </font>
+
**<sup>4</sup>He target: [https://hdops.jlab.org/wiki/index.php/Cryogenic_Target_Shift cryogenic target]
 +
**Be target  18 mm,  5&middot;10<sup>-4</sup> R.L. </font>
  
 
* Miscellaneous:
 
* Miscellaneous:
** <font color="red">CPP (Charged pion polarizability) tests ??</font>
+
** CPP (Charged pion polarizability) tests  
** <font color="red">Transition Radiation Detector in the Hall ??</font>
+
***To be set-up and done during the last day of DIRC allocated commissioning time.
 +
***Use LH2 target, keep solenoid on at nominal field, DIRC stays in nominal position.
 +
***Move downstream platform downstream
 +
***Install passive shielding in front of TOF.
 +
***Tests (to be done at various positions of passive shielding).
 +
***End of test: remove shielding, ramp down solenoid.
 +
** Transition Radiation Detector in the Hall
 +
***Parasitic
  
 
==General Information==
 
==General Information==

Revision as of 10:56, 15 January 2019

Spring 2019 GlueX Run

Meeting General Agenda

Connect Information

To connect from the outside by phone please do the following

1.) To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.

2.) To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.

3.) To join via phone, use one of the following numbers and the Conference ID: 660743227.

4.) The moderator code is 8394

Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada

Specific instructions for connecting from JLab's Hall D conference room:

  • Turn polycon on if necessary (do it before turning the computer on)
  • With the polycon, place a call at 199.48.152.152
  • Press # to enable the polycom keypad, then enter the meeting id: 660743227 and #
  • You may have to unmute the microphone: #*4
  • Turn the computer on if needed

Beam and Hall configuration

  • Beam energy expected:
    • 11.630 GeV (10 MeV less than value for Fall 2016 to Fall 2018 up Nov. 15th, due to imbalanced linac setting).
  • Solenoid:
    • DIRC commissioning: 1350A
    • PrimEx-eta run: off
  • CW Beam:
    • 250 MHz frequency.
    • Range:
      • DIRC commissioning: 50 nA-1.2 μA.
      • PrimEx-eta run: 1 nA-500 nA. ??
    • Chopper slit: shared with Hall C until 03/10/2019. Then alone on slit A.
    • Standard current and radiators
      • DIRC: Standard commissioning current: 225 nA on 1.4·10-4 R.L. radiator (JD70-104 17 μm diamond).
      • DIRC: Hight intensity tests: 1.2 μA on 1.4·10-4 R.L. radiator (JD70-104 17 μm diamond) (or 0.5 μA on JD70-105, 47 μm diamond of 3.9·10-4 R.L.)
      • PrimEx-eta run: Standard production on 4He: 320 nA. on 10 µm Al (11.2·10-5 R.L.)
      • PrimEx-eta run: Standard production on Be: 30 nA. on 30 µm Al (33.7·10-5 R.L.)
    • RSAD limit for most of the run, excluding high intensity tests: ?? nA on ??·10-4 R.L. radiator.
  • Position Slow Lock on or FFB on (FFB doesn't operate below 50nA).
  • Radiators:
    • Goniometer radiators:
      • Diamond JD70-104 (17 μm - 1.4·10-4 R.L., 7×7 mm²) - wider rocking curve - Tested in Spring 2018 and used at the beginning of Fall 2018. Probably has some radiation degradation.
      • Diamond JD70-105 (47 μm - 3.9·10-4 R.L., 7×7 mm²) - Used for the second part of GlueX's Fall 2018 run. Good performance.
    • 40 μm Al radiator (44.9·10-5 R.L.)
    • V-wire (for TAC run).
    • Amorphous
      • 1.64 µm Al (1.86·10-5 R.L., see study)
      • 10 µm Al (11.2·10-5 R.L.)
      • 30 µm Al (33.7·10-5 R.L.)
  • Tagger quadrupole on (-4.2 A).
  • Collimator hole: Both 5 mm diameter and 3.4 mm diameter. Default running: 5.0 mm.
  • Miscellaneous:
    • CPP (Charged pion polarizability) tests
      • To be set-up and done during the last day of DIRC allocated commissioning time.
      • Use LH2 target, keep solenoid on at nominal field, DIRC stays in nominal position.
      • Move downstream platform downstream
      • Install passive shielding in front of TOF.
      • Tests (to be done at various positions of passive shielding).
      • End of test: remove shielding, ramp down solenoid.
    • Transition Radiation Detector in the Hall
      • Parasitic

General Information

This document describes the run plan for the Hall D Fall 2018 run.

  • Schedule for the run:
  1. Jan. 22nd - 29th: Electron beam restoration
  2. Jan. 30th - Feb. 12th: 2-weeks DIRC Commissioning (Solenoid at nominal field. LH2 target)
  3. Feb. 12th - Apr. 7th: 8.5-weeks PrimEx-eta run (Solenoid off. Be then LH2 target ??).
  1. Nominally, every Mondays: 12h of beam study. Every Tuesdays, if necessary: 8h of RF recovery.
  • Accelerator overall plan and priorities:
  1. Deliver physics beam to 4 halls. (Hall A stop early, on March. 10th. Halls B and or C will always be at 5th pass, so Hall D beam will always be RF-separated.)
  • DIRC commissioning page
  • PrimeX run page
  • Test fast raster beam envelope measurement with larger x-rastering?
  • Any other tests/plans (DAQ, Trigger, CPP, TRDS, strait track run)

Runplan

Hall D situation room (current run plan)

Hall D counting room white board


Runplan time charts

Accelerator status

Hot Checkout

  1. Hot Check OUT Status 0% ready ; 0% checked ; 100% not ready

Readiness for Fall 18 run

  • Solenoid (Eugene/Beni)
  • Surveys (Tim/Mark)
  • DAQ (Sergei).
  • Trigger (Alex S.)
  • Beam line
    • Diamond status (Tim/Hovanes).
      • Discussion to install a low quality thick diamond (U.Conn. inventory) for DIRC commissioning: Schedule is too tight.
    • Tagger hodoscope (A. Somov)
    • Tagger microscope (Beni/Richard Jones)
      • All electronic has been turned on. Richard is checking the signals.
    • Goniometer (Hovanes).
    • Collimator, Active collimator, profiler, luminosity monitor (Hovanes/Alexandre Deur).
      • Act. Col. baselines have been zeroed mid July 2018 and checked on 08/15. To be checked before Spring 2019 run.
    • luminosity monitor
    • PS system (Alex Somov)
    • Beam line magnets (PS magnet sweeping magnet and tagger quads).
    • Polarimeter (Sebastian Cole/M. Dugger).
    • LH2 Target (Tim/Alexandre D.)
    • Be target
    • TAC (Hovanes/Alex Somov)
      • Plan to cured (oven) after the Fall 2018 run?
        • During TAC runs. TAC to be inserted on beam line with 2cm offset to avoid damaged area
    • Slow control (Hovanes).
    • RF (Elton/Beni)
    • Radiation monitors (Alexandre D.)
    • Halo Monitors (Hovanes)
  • Detector systems
    • ST (Mark Ito)
    • FDC (Lubomir)
    • CDC (Beni)
    • BCal (Elton/Mark D.)
    • FCal (Collin Gleason)
    • ComCal (Alex Somov)
    • TOF (Mark Ito/Beni/Alex. Ostrovidov)
    • DIRC (J. Stevens)
  • RSAD and ESAD Safety documents (Lubomir):
  • Phones
    • System experts need to start looking for their on-call phones
  • Hall Status/safety (Mark/Tim)
  • Other topics?