Difference between revisions of "Run Coordination Meetings:Spring2019 Run"

From GlueXWiki
Jump to: navigation, search
(Created page with "===Spring 2019 GlueX Run=== == Meeting General Agenda == <!--* Run Planning Meeting Notes, Jan. 30-Fev 6, 2019 --> ==Connect Information== To connect from the outside b...")
 
 
(99 intermediate revisions by 12 users not shown)
Line 2: Line 2:
  
 
== Meeting General Agenda ==
 
== Meeting General Agenda ==
<!--* [[Run Planning Meeting Notes, Jan. 30-Fev 6, 2019]] -->
+
[[Run Planning Meeting Notes, Feb 6 - Feb 13, 2019]]<br/>
 +
[[Run Planning Meeting Notes, Feb 14 - Feb 20, 2019]]<br/>
 +
[[Run Planning Meeting Notes, Feb 21 - Feb 27, 2019]]<br/>
 +
[[Run Planning Meeting Notes, Feb 28 - Mar 6, 2019]]<br/>
 +
[[Run Planning Meeting Notes, Mar 7 - Mar 13, 2019]]<br/>
 +
[[Run Planning Meeting Notes, Mar 14 - Mar 20, 2019]]<br/>
 +
[[Run Planning Meeting Notes, Mar 21 - Mar 27, 2019]]<br/>
 +
[[Run Planning Meeting Notes, Mar 28 - Apr 3, 2019]]<br/>
 +
[[Run Planning Meeting Notes, Apr 4 - Apr 10, 2019]]<br/>
 +
[[Run Planning Meeting Notes, Apr 11 - Apr 17, 2019]]<br/>
  
 
==Connect Information==
 
==Connect Information==
Line 27: Line 36:
  
 
==Beam and Hall configuration==
 
==Beam and Hall configuration==
 +
<font color="blue"><b> Information in blue is specifically for the DIRC commissioning </b></font>
 +
 +
<font color="magenta"><b> Information in magenta is specifically for the PrimEx-η run </b></font>
  
 
* Beam energy expected:  
 
* Beam energy expected:  
** 11.640 GeV (same value as Fall 2016 to Fall 2018 up Nov. 15th).
+
** 11.630 GeV (10 MeV less than value for Fall 2016 to Fall 2018 up Nov. 15th, due to imbalanced linac setting).
 
* Solenoid:
 
* Solenoid:
 
**DIRC commissioning: <font color="blue"><b>1350A </b></font>  
 
**DIRC commissioning: <font color="blue"><b>1350A </b></font>  
**PrimEx-eta run: <font color="blue"> off</b></font>  
+
**PrimEx-η run: <font color="magenta"><b> off</b></font>  
 
* CW Beam:  
 
* CW Beam:  
 
** 250 MHz frequency.  
 
** 250 MHz frequency.  
 
** Range:  
 
** Range:  
***DIRC commissioning: 1 nA-1.2 μA.  
+
***DIRC commissioning: 50 nA-1.2 μA.  
***PrimEx-eta run: 1 nA-<font color="red">500 nA. ??</font>
+
***PrimEx-η run: 1 nA-500 nA.
** Chopper slit: shared with Hall A until 03/102019. Then alone on slit A.   
+
** Chopper slit: shared with Hall C until 03/10/2019. Then alone on slit A.   
 
**Standard current and radiators
 
**Standard current and radiators
*** DIRC: Standard commissioning current: 225 nA on 1.4&middot;10<sup>-4</sup> R.L. radiator (JD70-104 17 μm diamond).  
+
*** DIRC: Standard commissioning current: <font color="blue"><b>225 nA </b></font> on 1.4&middot;10<sup>-4</sup> R.L. radiator (JD70-104 17 μm diamond).  
*** DIRC: Hight intensity tests: 1.2 μA on 1.4&middot;10<sup>-4</sup> R.L. radiator (JD70-104 17 μm diamond) (or 0.5 μA on JD70-105, 47 μm diamond of 3.9&middot;10<sup>-4</sup> R.L.)
+
*** DIRC: Hight intensity tests: 5 days at 1.2 μA on 1.4&middot;10<sup>-4</sup> R.L. radiator (JD70-104 17 μm diamond) (or 0.5 μA on JD70-105, 47 μm diamond of 3.9&middot;10<sup>-4</sup> R.L.)
***PrimEx-eta run: Standard production on LH2: "red">100 nA. ??</font> on 30 &micro;m Al (33.7&middot;10<sup>-5</sup> R.L.)
+
***PrimEx-η run: Standard production on <font color="magenta"><b><sup>4</sup>He: 320 nA. </b></font> on 10 &micro;m Al (11.2&middot;10<sup>-5</sup> R.L.)
***PrimEx-eta run: Standard production on Be: "red">30 nA. ??</font> on 30 &micro;m Al (33.7&middot;10<sup>-5</sup> R.L.)
+
***PrimEx-η run: Standard production on <font color="magenta"><b>Be: 100 nA.</b></font> on 10 &micro;m Al (11.2&middot;10<sup>-5</sup> R.L.)
** RSAD limit for most of the run, excluding high intensity tests: <font color="red">?? nA on ??&middot;10<sup>-4</sup> R.L. radiator.</font>
+
** RSAD limit for most of the run, excluding high intensity tests: 1.3 μA on &middot;10<sup>-4</sup> R.L. radiator for 5 days.
* FFB on or Position Slow Lock on (FFB doesn't operate below 50nA).   
+
* Position Slow Lock on or FFB on (FFB doesn't operate below 50nA).   
 
* Radiators:  
 
* Radiators:  
 
**Goniometer radiators:
 
**Goniometer radiators:
Line 55: Line 67:
 
**V-wire (for TAC run).
 
**V-wire (for TAC run).
 
**Amorphous
 
**Amorphous
*** 1.64 &micro;m Al (1.86&middot;10<sup>-5</sup> R.L., see [https://logbooks.jlab.org/entry/3631428 study])
+
*** 1.64 &micro;m Al (1.86&middot;10<sup>-5</sup> R.L., see [https://logbooks.jlab.org/entry/3631428 study])</font>
*** 10 &micro;m Al (11.2&middot;10<sup>-5</sup> R.L.)
+
*** <font color="magenta"><b> 10 &micro;m Al (11.2&middot;10<sup>-5</sup> R.L.)</b></font>
*** 30 &micro;m Al (33.7&middot;10<sup>-5</sup> R.L.)
+
*** 30 &micro;m Al   (33.7&middot;10<sup>-5</sup> R.L.)
  
 
*Tagger quadrupole on (-4.2 A).  
 
*Tagger quadrupole on (-4.2 A).  
  
* Collimator hole: Both 5 mm diameter and 3.4 mm diameter. <font color="blue"><b>Default running: 5.0 mm.</b></font>
+
* Collimator hole: Both 5 mm diameter and 3.4 mm diameter. <b>Default running: 5.0 mm.</b>
  
 
* Targets:  
 
* Targets:  
 
**LH2 target: [https://hdops.jlab.org/wiki/index.php/Cryogenic_Target_Shift cryogenic target]
 
**LH2 target: [https://hdops.jlab.org/wiki/index.php/Cryogenic_Target_Shift cryogenic target]
**Be target <font color="red">?? mm,  ??&middot;10<sup>-4</sup> R.L. radiator.</font>
+
**<sup>4</sup>He target: [https://hdops.jlab.org/wiki/index.php/Cryogenic_Target_Shift cryogenic target]
 +
**Be target  18 mm,  5&middot;10<sup>-4</sup> R.L. </font>
  
 
* Miscellaneous:
 
* Miscellaneous:
** <font color="red">CPP (Charged pion polarizability) tests</font>
+
** CPP (Charged pion polarizability) shielding will be temporary installed. 
** <font color="red">Transition Radiation Detector in the Hall ??</font>
+
** Transition Radiation Detector in the Hall (Parasitic runs)
 
+
  
 
==General Information==
 
==General Information==
  
This document describes the run plan for the Hall D Fall 2018 run.  
+
This document describes the run plan for the Hall D Spring 2019 run.  
* Schedule for the run:
+
<!--* Original Schedule for the run:
# Aug. 15th - 21st: Electron beam restoration
+
# Jan. 22nd - 29th: Electron beam restoration.
<!--# Aug. 21st - Oct. 28th: GlueX-I run (E=11.64 GeV).
+
# Jan. 30th - Feb. 12th: 2-weeks DIRC Commissioning <font color="blue">(Solenoid at nominal field. LH2 target)</font>)
# Oct. 28th - Nov. 19th: DIRC and ComCal installation (Solenoid will be ramped down but kept cold)
+
# Feb. 12th: <font color="red">1 day of CPP test?? (Solenoid at nominal field. LH2 target)</font>)
# Nov. 20th - Dec. 09th: GlueX-II and Primex tests. Lower energy measurement checks. (E=10.3 GeV) -->
+
# Feb. 12th - Apr. 7th: 8.5-weeks PrimEx-eta run (Solenoid off. <font color="magenta">"empty Be" (no target, only the rohacell frame is present), then Be then <sup>4</sup>He target </font>). -->
# Aug. 21st - Nov. 26th: GlueX-I run (E=11.64 GeV).
+
 
# Nov. 26th - Nov. 28th: Beam energy change/ComCal installation (Solenoid will be ramped down but kept cold)
+
* Schedule for the run (Updated 01/28/2019):
# Nov. 29th - Dec. 09th: Primex tests. (E=10.3 GeV)  
+
# Jan. 22nd - Feb 7th: Electron beam restoration. (Now pushed to Feb. 7th)  
# Dec. 10th - Dec. 12th: Linac energy change.  
+
# Feb. 7thth - Feb. 20th: 2-weeks DIRC Commissioning <font color="blue">(Solenoid at nominal field. LH2 target)</font>)
# Dec. 13th - Dec. 19th: Primex tests. (E=9.0 GeV)
+
# Feb. 20th <font color="red">(tentatively!)</font>: 1 day of CPP test (Solenoid at nominal field. LH2 target)
 +
## Move the FCAL platform downstream. Install the CPP shielding mount.
 +
## Take data in 3 configurations: a) no shilding, b) 1 layer of shielding, 2 layers.
 +
# Feb. 20th morning <font color="red">(tentatively!)</font> - Apr. 15th: PrimEx-eta run . Tentative plan:
 +
## Turn off the solenoid.
 +
## Install the FCAL platform in the regular position. Remove the LH2 cell (leave only the shell). Remove ST. Reinstall the beam line.
 +
## Take data for CCAL calibration at a low beam current. 3 shifts.
 +
## Take PRIMEX data with no target. 1 shift.
 +
## Intall Be target. Install ST (not connecting the cables). Fiducialize the Be target. Survey the target <font color="red">(is it needed?)</font>. Survey the CCAL in the central position.
 +
## Take PRIMEX data. 5 shifts.
 +
## Remove Be target, Install the LHe cell, install and connect the ST. Fiducialize the cell and survey the target.
 +
## Take PRIMEX data with the empty LHe target (not cooling the target). 2 shifts.
 +
## Cool and fill the LHe target.
 +
## Take PRIMEX data till the end.
 +
 
 +
 
  
# Every Mondays: 12h of beam study. Every Tuesdays, if necessary: 8h of RF recovery.
+
# Nominally, every Mondays: 12h of beam study. Every Tuesdays, if necessary: 8h of RF recovery.
  
 
* Accelerator overall plan and priorities:
 
* Accelerator overall plan and priorities:
#Deliver physics beam to 4 halls. (Hall A to starts later, on Sept 12th)
+
#Deliver physics beam to 4 halls. (Hall A stop early, on March. 10th. Halls B and or C will always be at 5th pass, so Hall D beam will always be RF-separated.)
  
* Experiment: GlueX [https://misportal.jlab.org/mis/physics/experiments/searchProposals.cfm?paramHall=D&paramExperimentEnergy=12GeV&paramExperimentStatusList=A,G E12-06-102] Production
+
<!--* Experiment: GlueX [https://misportal.jlab.org/mis/physics/experiments/searchProposals.cfm?paramHall=D&paramExperimentEnergy=12GeV&paramExperimentStatusList=A,G E12-06-102] Production -->
* Planned tests (Accelerator, related to Hall D):
+
* [https://halldweb.jlab.org/wiki/index.php/Spring_2019_DIRC_Commissioning DIRC commissioning page]
** <font color="red">Further tests of nA BPM and stripline BPM ?</font>
+
* [https://halldweb.jlab.org/wiki/index.php/Spring_2019_Primex PrimeX run plan]
** Test fast raster beam envelope measurement with larger x-rastering. <font color="red">Need detailed plan, including time estimate</font>
+
* DAQ and Trigger high-intensity tests during DIRC commissioning.
* Planned tests (Hall D):
+
* CPP tests during last day of DIRC commissioning.
** At 11.6 GeV:
+
* Parasitic TRD runs.
*** Align JD70-105 (47 μm - 3.9·10-4 R.L., 7×7 mm²) (Hovanes) and take enough data to achieve ~1% statistic on rho polarimetry (less than a shift at 190 nA).
+
* If opportunity arises, test fast raster beam envelope measurement with larger x-rastering (Richard Jones)
*** Test fast raster beam envelope measurement with larger x-rastering. (R. Jones) <font color="red">Need detailed plan, including time estimate</font>
+
* <font color="red">Strait track runs not expected to be needed</font>
*** High-intensity GlueX L1 and DAQ tests (A. Somov, S. Furletov)
+
*** ToF trigger test for Muon chamber. With solid target. (D. Lawrence/E. Smith) <font color="red">Need detailed plan, including time estimate</font>
+
***TRD test (parasitic) (S. Furletov, L. Penchev)
+
** At 10.2 and 9 GeV:
+
***<strike> DIRC commissioning (J. Stevens) <font color="red">Need detailed plan, including time estimate</font> </strike>
+
***ComCal commissioning  (no B-field, no DC on) (A. Somov) [https://halldweb.jlab.org/wiki/images/6/68/Run_Plan_Fall_2018-v3.jpg] [https://halldweb.jlab.org/wiki/index.php/File:Run_Plan_Fall_2018-v3b.jpg] [https://halldweb.jlab.org/wiki/index.php/File:Run_Plan_Fall_2018-v3c.jpg] [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2018-v5.pdf]
+
***Strait track run (L. Penchev)
+
***High-intensity GlueX L1 and DAQ tests (A. Somov, S. Furletov)  
+
  
 
* Expected Staffing and responsibilities:  
 
* Expected Staffing and responsibilities:  
 
**The Run Coordinator oversees the commissioning:  
 
**The Run Coordinator oversees the commissioning:  
*** Aug. 15th-Aug. 21st, 7 days: Alexandre Deur (accelerator restoration)
+
*** Jan. 22nd-Feb. 7th, 14 days: Alexandre Deur (accelerator restoration)
*** Aug. 22nd-Aug. 28th, 7 days: Alexandre Deur
+
*** Feb. 7th-Feb. 13th, 7 days: Alexandre Deur
*** Aug. 29th-Sept 4th, 7 days: Cristiano Fanelli
+
*** Feb. 13th-Feb. 20th, 7 days: Wenliang Li 
*** Sept. 5th-Sept. 11th, 7 days: Alexandre Deur (accelerator down for repair)
+
*** Feb. 20th-Feb. 27th, 7 days: Sean Dobbs
*** Sept. 12th-Sept. 18th, 7 days: Alexander Austregesilo
+
*** Feb. 27th-March 6th, 7 days: Justin Stevens
*** Sept. 19th-Sept. 25th, 7 days: Thomas Britton
+
***March 6th-March 13th, 7 days: Alexander Austregesilo
*** Sept. 26th-Oct. 2nd, 7 days: Naomi Jarvis
+
*** March 13th-March 20th, 7 days: Colin Gleason
*** Oct. 3rd-Oct. 9th, 7 days: Stuart Fegan
+
*** March 20th-March 27th, 7 days: Richard Jones
*** Oct. 10th-Oct. 16th, 7 days: Colin Gleason
+
*** March 27th-Apr. 3rd, 7 days: Stuart Fegan
*** Oct. 17th-Oct. 23rd, 7 days: Ben. Zihlmann (Deputy PDL: A. Deur)
+
*** Apr. 3rd-Apr. 10th, 7 days: Ilya Larin
*** Oct. 24th-Oct. 31st, 7 days: Daniel Lersch <!--(Oct. 28th-31st: Hall open for installation)-->
+
*** Apr. 10th-Apr. 15th, 5 days: Joshua Crafts
*** Oct. 31th-Nov. 7th, 7 days: Naomi Jarvis  <!--Hall open for installation-->
+
**The Physics Division Liaison (PDL) and Hall D Work Coordinator/Safety Warden (M. Stevens) verify that the proper safety rules are followed. PDL is:
*** Nov. 7th-Nov. 14th, 7 days: Alexander Austregesilo <!--Hall open for installation-->
+
***Lubomir Penchev
*** Nov. 14th-Nov. 20th, 7 days: Alexandre Deur <!--(Nov. 14th-19th: Hall open for installation) -->
+
*** Nov. 21st-Nov. 27th, 7 days: Ben. Zihlmann
+
*** Nov. 28st-Dec. 4th, 7 days: Wenliang Li
+
*** Dec. 5th-Dec. 11th, 7 days: Liping Gan
+
*** Dec. 12th-Dec. 20th, 8 days: Jeorg Reinhold
+
**The Physics Division Liaison (PDL) and Hall D Work Coordinator/Safety Warden (M. Stevens) verify that the proper safety rules are followed. PDLs are:
+
***Benedikt Zihlmann (except during Oct. 17th-Oct. 23rd: A. Deur to be PDL).
+
 
**The analysis coordinator (Alexander Austregesilo) oversees the off-line diagnostic of the different systems and analysis of the data.  
 
**The analysis coordinator (Alexander Austregesilo) oversees the off-line diagnostic of the different systems and analysis of the data.  
 
**Shifts: 2 persons per shift.
 
**Shifts: 2 persons per shift.
Line 137: Line 149:
 
* Useful links:
 
* Useful links:
 
**Accelerator schedule
 
**Accelerator schedule
***[https://www.jlab.org/exp_prog/experiment_schedule/2018/20180511.0_ExpSch.pdf long term calendar]
+
***[https://www.jlab.org/exp_prog/experiment_schedule/2018/20181108.2.pdf Long term schedule]
 
***[https://accweb.acc.jlab.org/calendar/  Scheduled Accelerator Down (SAD)/Maintenance Calendar]
 
***[https://accweb.acc.jlab.org/calendar/  Scheduled Accelerator Down (SAD)/Maintenance Calendar]
 
***[http://accboard.acc.jlab.org/ http://accboard.acc.jlab.org/]  
 
***[http://accboard.acc.jlab.org/ http://accboard.acc.jlab.org/]  
Line 150: Line 162:
 
***[https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:_Spring_2017_Run 11.64 GeV Spring 2017]
 
***[https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:_Spring_2017_Run 11.64 GeV Spring 2017]
 
***[https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:Fall2017_Spring2018_Run 11.64 GeV Fall 2017 and Spring 2018 runs]
 
***[https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:Fall2017_Spring2018_Run 11.64 GeV Fall 2017 and Spring 2018 runs]
 +
***[https://halldweb.jlab.org/wiki/index.php?title=Run_Coordination_Meetings:Fall2018_Run 11.64 GeV Fall 2018]
 
** Links to beam parameters/radiation level monitoring:
 
** Links to beam parameters/radiation level monitoring:
 
***[https://www.jlab.org/accel/RadCon/opsgraphs/8h/halld_8h.pdf Last 8-hours plots showing 1-minute, 10-minute, and hourly averages]  
 
***[https://www.jlab.org/accel/RadCon/opsgraphs/8h/halld_8h.pdf Last 8-hours plots showing 1-minute, 10-minute, and hourly averages]  
Line 172: Line 185:
 
<!--#*Check bleedthrough level. 10min Hovanes. <font color="red">Hall A/B/C needs to be running</font>-->
 
<!--#*Check bleedthrough level. 10min Hovanes. <font color="red">Hall A/B/C needs to be running</font>-->
 
#*Establish good photon beam  
 
#*Establish good photon beam  
#* Make sure tagger quadrupole is on and at -4.2 A. (It can be turned on only once the Hall is n power/beam permit.)
+
#* Make sure tagger quadrupole is on and at -4.2 A. (It can be turned on only once the Hall is in power/beam permit.)
 
#**Insert 2*10<sup>-5</sup> RL radiator. <b><font color="red">Call MCC and ask to mask the FSD and turn off beam each time a radiator is moved</font></b>
 
#**Insert 2*10<sup>-5</sup> RL radiator. <b><font color="red">Call MCC and ask to mask the FSD and turn off beam each time a radiator is moved</font></b>
 
#*** Typical levels are (for 2×10<sup>-5</sup> radiator, electron beam current 50 nA)
 
#*** Typical levels are (for 2×10<sup>-5</sup> radiator, electron beam current 50 nA)
Line 180: Line 193:
 
#****RAD508_P1= <span style="color:#ff00ff">~10 mrad/hr</span> (collimator cave, gammas).
 
#****RAD508_P1= <span style="color:#ff00ff">~10 mrad/hr</span> (collimator cave, gammas).
 
#****RAD508_P2 <span style="color:#ff00ff">< ~ 0. mrad/hr</span> (Hall. Neutrons).  
 
#****RAD508_P2 <span style="color:#ff00ff">< ~ 0. mrad/hr</span> (Hall. Neutrons).  
#*Verify beam position and envelope.
+
#*Verify beam position and envelope (Hovanes).
 
#**Ask MCC to set beam position on 5C11b to x=-0.5 mm and y=+1.0 mm.
 
#**Ask MCC to set beam position on 5C11b to x=-0.5 mm and y=+1.0 mm.
 
#**Ask MCC for 5C11 and 5C11B HARP. Then do our radiator HARP scan, [https://halldweb.jlab.org/hdops/wiki/index.php/Beam_Line_Detectors_Shift#Radiator_Harp_Scan see instruction]. If it looks good, proceed to next step. Otherwise, inform MCC.
 
#**Ask MCC for 5C11 and 5C11B HARP. Then do our radiator HARP scan, [https://halldweb.jlab.org/hdops/wiki/index.php/Beam_Line_Detectors_Shift#Radiator_Harp_Scan see instruction]. If it looks good, proceed to next step. Otherwise, inform MCC.
Line 188: Line 201:
 
#**Run 5 min with the 10<sup>-4</sup> radiator (Call MCC). Beam current: 50nA. Repeat at 100 nA and 200 nA  
 
#**Run 5 min with the 10<sup>-4</sup> radiator (Call MCC). Beam current: 50nA. Repeat at 100 nA and 200 nA  
 
#**Run 3 min with the 3*10<sup>-4</sup> radiator (Call MCC). Beam current: 50nA. Repeat at 100 nA and 200 nA  
 
#**Run 3 min with the 3*10<sup>-4</sup> radiator (Call MCC). Beam current: 50nA. Repeat at 100 nA and 200 nA  
#*PS detector threshold scan.  (A. Somov, 1h)
 
#*Microscope yield study (row-by-row scan).  (Richard/Jim McIntyre, 1h)
 
#**Call Richard Jones <!-- 860-377-5224--> 20 min before the start of this task. Call Alex Somov to set-up the PS trigger.
 
#**Insert 5mm collimator.
 
#**[https://logbooks.jlab.org/entry/3497901 Procedure to follow]
 
#**Any type of beam quality will do.
 
#**10<sup>-4</sup> radiator, 10<sup>-3</sup> convertor, 80 nA beam current.
 
 
#* Photon flux optimization and Active Collimator calibration. (20 + 20 mins). Call Hovanes.
 
#* Photon flux optimization and Active Collimator calibration. (20 + 20 mins). Call Hovanes.
 
#**re-Insert the 10<sup>-4</sup> radiator (Call MCC). Use about 100 nA beam current. This will provide the Act. Col. nominal positions for its high gain values.
 
#**re-Insert the 10<sup>-4</sup> radiator (Call MCC). Use about 100 nA beam current. This will provide the Act. Col. nominal positions for its high gain values.
Line 202: Line 208:
 
#**Until Hovanes determines to optimal 5C11b and Active Collimator position, keep profiler in and beam locked (MCC's duty) on the nominal 5C11b and x=0,y=0 profiler position. Once Active Collimator nominal beam position is known, retract profiler and lock the beam (MCC) on the active collimator.
 
#**Until Hovanes determines to optimal 5C11b and Active Collimator position, keep profiler in and beam locked (MCC's duty) on the nominal 5C11b and x=0,y=0 profiler position. Once Active Collimator nominal beam position is known, retract profiler and lock the beam (MCC) on the active collimator.
 
#Detector and beamline checkout.
 
#Detector and beamline checkout.
 +
#*PS detector threshold scan.  (A. Somov, 1h) <font color="magenta">Can be done early if necessary: nominal beam quality not mandatory. </font>
 +
#*Microscope yield study (row-by-row scan).  (Richard Jones/Jim McIntyre, 1h) <font color="magenta">Can be done early if necessary: nominal beam quality not mandatory. </font>
 +
#**Call Richard Jones <!-- 860-377-5224--> 20 min before the start of this task. Call Alex Somov to set-up the PS trigger.
 +
#**Insert 5mm collimator.
 +
#**[https://logbooks.jlab.org/entry/3497901 Procedure to follow]
 +
#**Any type of beam quality will do.
 +
#**10<sup>-4</sup> radiator, 10<sup>-3</sup> convertor, 80 nA beam current.
 
#*Reestablish L1 trigger Alex. Somov. 2h).  
 
#*Reestablish L1 trigger Alex. Somov. 2h).  
 
#*Reestablish DAQ (Sergei, 2h).
 
#*Reestablish DAQ (Sergei, 2h).
 
#*General detector calibration (Sean Dobbs. <!--703-887-1776--> 1h). Use 10<sup>-4</sup> radiator.  
 
#*General detector calibration (Sean Dobbs. <!--703-887-1776--> 1h). Use 10<sup>-4</sup> radiator.  
#**Run 15 min (solid time) in Long Mode (Mode 10).
+
#**Run 15 min (solid time) in Long Mode (Mode 10)
#**Long mode (Mode 10) w/ FCAL LED on 1-10Khz  (Mark D.)  
+
#**Run 15 min (solid time) in Production Mode (Mode 9).
#**Run 15 min (solid time) in Production Mode (Mode 9).  
+
#Check 17 μm diamond (JD70-104) alignement. (We expect to use 2 polarization configuration only) (Hovanes. 1h).
#**CDC HV scan [https://halldweb.jlab.org/hdops/wiki/index.php/Fall_2018_CDC_HV_scan_procedure Procedure to follow] (Naomi Jarvis, 4h)
+
#DIRC commissioning
#High beam current systematic test (8h. Can be done before or after diamond alignment, as most convenient for the alignment)
+
#*[https://halldweb.jlab.org/wiki/index.php/Spring_2019_DIRC_Commissioning#Commissioning_Timeline.2C_Tasks_and_Milestones DIRC commissioning page]
**Insert 10 μm Al. radiator (1.12*10<sup>-4</sup> RL, on amorphous rad. ladder). Take 200M events (standard prod.) at 680 nA beam current. Monitor carefully rates in wire chambers. 
+
#*Standard configuration: 17 μm diamond, 225 nA (1.2 μA for high intensity run), 5 mm hole, TPol on (for TPol syst. studies. Not necessary for DIRC) <font color="red"> 75 μm TPol convertor??</font>. 2h runs <b>and no more, as it may be hard to correct for calibration drifts</b>. Cycle over 3 sets of runs: ∣∣, then ⊥, then amorphous runs (i.e. two diamond settings only). DAQ start run overhead: 3min.  
**Insert 40 μm Al. radiator (4.49*10<sup>-4</sup> RL, on goni.). Take 200M events (standard prod.) at 170 nA beam current. Monitor carefully rates in wire chambers. 
+
#*Luminosity scans on amorphous radiator. 50-300 nA. <font color="red">Use 10 &micro;m Al (1.12&middot;10<sup>-4</sup> R.L.), on amorphous radiator ladder.</font>
#Align 17 μm diamond (JD70-104) for the 4 polarization configurations (Hovanes. 16h).
+
<!--#*Log in run information in the shift summary (make a run list). For each production run, log useful comments on DAQ comment window, see [https://halldweb.jlab.org/hdops/wiki/index.php/Best_Practices/FAQ]-->
#Gluex data production
+
#*Physics production data with 17 μm diamond, 530 nA, 5 mm hole, 75 μm TPol convertor. Ratio of para./transverse/45<sup>o</sup>/135<sup>o</sup> data:25/25/25/25. <font color="red">300M events per configuration. 2h runs <b>and no more, as it may be hard to correct for calibration drifts</b></font>. Switch polarization every 300M events. Time to switch: 10min. DAQ start run overhead: 3min.  
+
#*Amorphous run. Every set of 4 diam. orientation runs. 150M events. 170 nA on 40 μm Al. radiator (4.49*10<sup>-4</sup> RL, on goni.). Time to switch from pol. to unpol.: 10min.  time to switch from unpol. to pol.: 30min.
+
#*Log in run information in the shift summary (make a run list). For each production run, log useful comments on DAQ comment window, see [https://halldweb.jlab.org/hdops/wiki/index.php/Best_Practices/FAQ]
+
 
#*Tagger quadrupole on
 
#*Tagger quadrupole on
#*Harp scans once a day: 15 min.
+
#*Harp scan (30 min): Only once in the middle of the DIRC commissioning (beside the ones done during beam set-up).
#*If commissioning and analysis are successful, once a day, a beam envelope measurement by rastering on Act. Col. <font color="red">??min</font>
+
#*One Empty target run (2h: 1<sup>-</sup> h to empty/fill back the target, 1h running). Standard production current.  
#*Empty target run every 2 week (2h: 1<sup>-</sup> h to empty/fill back the target, 1h running). Standard production current.
+
#*Long mode 10 min run. Twice or Thrice a week. Beam must be off. On opportunistic basis if possible (Purpose: monitor neutron radiation damage to ST due to nuclear target higher neutron yield.)
#*Long mode 10 min run. Once a week (20 min).  
+
#*<font color="red">No TAC run necessary</font>
#Align  JD70-105 (47 μm - 3.9·10-4 R.L., 7×7 mm²) for <font color="red">2 or 4?</font> polarization configurations (Hovanes 12h) and take enough data to achieve ~1% statistic on rho polarimetry (8h at 190 nA). Decide if it is better to run on this diamond.
+
#Transition to PrimEx-η
#Two TAC runs at the beginning and end of 11.6 GeV run. <font color="magenta"><b>May require other halls to be off due to bleedthrough</b></font> (Hovanes, Alex Somov 8/h run.)
+
#* CPP (Charged pion polarizability) tests  (Not firm yet.)
#Luminosity scans (J. Stevens)?
+
#**To be set-up and done during the last day of DIRC allocated commissioning time.
#Some physics production data with thin diamond and 3.4 mm hole<font color="red"> 11h (1 cycles of runs). More data may be taken if beam stability and assessed polarization warranty it</font>.
+
#**Use LH2 target, keep solenoid on at nominal field, DIRC stays in nominal position.
#<font color="red">ToF runs for muon chamber? Need solid target. Need detailed plan, including time estimate</font>
+
#**Move downstream platform downstream
#Parasitic TRD run
+
#**Install passive shielding in front of TOF.  
#During 10.2 GeV and 9.0 runs:
+
#**Set-up and check specific CPP trigger: 2h (Alex Somov).
#*Re-establish good photon beam. Ion Chamber thresholds to be set each time electron beam energy changes.  
+
#**Tests (to be done for various thicknesses of passive shielding).
#*<font color="red">Set PS field to rescaled value? </font>
+
#**End of test: ramp down solenoid, remove shielding.
#*<font color="red">Realign one of the diamond? </font>
+
#PrimEx-η
#*DIRC commissionning (J. Stevens) <font color="red">Need detailed plan, including time estimate</font>
+
#*[https://halldweb.jlab.org/wiki/index.php/Spring_2019_Primex PrimEx-η runplan page]
#* ComCal commissioning (A. Somov) <font color="red">Need detailed plan, including time estimate</font>
+
#*Standard configuration: 10 &micro;m Al (11.2&middot;10<sup>-5</sup> R.L. Beam current depends on target. 2h runs <b>and no more, as it may be hard to correct for calibration drifts</b></font>. DAQ start run overhead: 3min.
#* Gather data to be compared to CLAS results. (J. Stevens) Intersperesed with above commissioning. <font color="red">Need detailed plan, including time estimate</font>
+
#*Two TAC runs (to be done with the TAC detector, not with ComCal).
#* L1 and DAQ high luminosity tests (A. Somov/S. Furletov)
+
#**First one: shortly after March 10th, once we Hall A is down and we run on the Hall A slit.
#* <font color="red"> Luminosity scans? (J. Stevens) </font>
+
#**Second one: near the end of the run.
#*Straight track run (16h end of 10.2 GeV period) (Lubomir)/ComCal test (A. Somov?)
+
#**HARP scan (only Hall D harp): 10 min. Every two days. 
#**Ramp down solenoid magnet (8h)
+
#*Long mode 10 min run. Twice or Thrice a week. Beam must be off. On opportunistic basis if possible (Purpose: monitor neutron radiation damage to ST due to nuclear target higher neutron yield.)
#**Take straight track run data (Lubomir)
+
#**ComCal test (no B-field, no DC on)
+
#*<font color="red">ToF runs for muon chamber? Need solid target. Need detailed plan, including time estimate</font>
+
#*Parasitic TRD runs
+
  
 
== Hall D situation room (current run plan) ==
 
== Hall D situation room (current run plan) ==
Line 248: Line 253:
 
  [https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]
 
  [https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]
  
  GoogleDoc Spreadsheet of [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1865737386 Trigger Statistics]
+
  <!--GoogleDoc Spreadsheet of [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1865737386 Trigger Statistics] -->
  
 
== Runplan time charts==
 
== Runplan time charts==
  
'''Fall 2018 time chart''':
+
'''Spring 2019 time chart''':
[[File:Fall18_week1.jpg|70px|thumb|none]]
+
[[File:Spring19_week1.jpg|70px|thumb|none]]
Fall 2018 commissioning/run time chart. Week 1.<br/>  
+
Spring 2019 commissioning/run time chart. Week 1.<br/>  
 
The horizontal scale is the time during which beam is available (in other words, it would be the real time with 100% of beam efficiency).<br/>
 
The horizontal scale is the time during which beam is available (in other words, it would be the real time with 100% of beam efficiency).<br/>
 
The task time estimates given on the plot have 100% contingency.
 
The task time estimates given on the plot have 100% contingency.
[[File:Fall18_week2.jpg|70px|thumb|none|  ]]
+
[[File:FSpring19_week2.jpg|70px|thumb|none|  ]]  
 
Run time chart. Week 2.  
 
Run time chart. Week 2.  
[[File:Fall18_week3.jpg|70px|thumb|none|  ]]
+
[[File:FSpring19_week3.jpg|70px|thumb|none|  ]]  
 
Run time chart. Week 3.  
 
Run time chart. Week 3.  
[[File:Fall18_week4.jpg|70px|thumb|none|  ]]
+
<!--[[File:FSpring19_week4.jpg|70px|thumb|none|  ]]  
 
Run time chart. Week 4.  
 
Run time chart. Week 4.  
[[File:Fall18_week5.jpg|70px|thumb|none|  ]]
+
[[File:FSpring19_week5.jpg|70px|thumb|none|  ]]  
 
Run time chart. Week 5.  
 
Run time chart. Week 5.  
[[File:Fall18_week6.jpg|70px|thumb|none|  ]]
+
[[File:FSpring19_week6.jpg|70px|thumb|none|  ]]  
 
Run time chart. Week 6.  
 
Run time chart. Week 6.  
[[File:Fall18_week7.jpg|70px|thumb|none|  ]]
+
[[File:FSpring19_week7.jpg|70px|thumb|none|  ]]  
 
Run time chart. Week 7.  
 
Run time chart. Week 7.  
[[File:Fall18_week8.jpg|70px|thumb|none|  ]]
+
[[File:FSpring19_week8.jpg|70px|thumb|none|  ]]  
 
Run time chart. Week 8.  
 
Run time chart. Week 8.  
[[File:Fall18_week9.jpg|70px|thumb|none|  ]]
+
[[File:FSpring19_week9.jpg|70px|thumb|none|  ]]  
Run time chart. Week 9.  
+
Run time chart. Week 9. -->
[[File:Fall18_week10.jpg|70px|thumb|none|  ]]
+
Run time chart. Week 10.
+
----
+
Low energy run (10.3 and 9 GeV)
+
[[File:Fall18_week11.jpg|70px|thumb|none|  ]]
+
Run time chart. Week 11.
+
[[File:Fall18_week12.jpg|70px|thumb|none|  ]]
+
Run time chart. Week 12.
+
[[File:Fall18_week13.jpg|70px|thumb|none|  ]]
+
Run time chart. Week 13.
+
  
 +
<!--*
 
----
 
----
 
 
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America/New_York View Runplan google calendar]
 
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America/New_York View Runplan google calendar]
* [http://calendar.google.com Edit Runplan google calendar]
+
* [http://calendar.google.com Edit Runplan google calendar]  
 
* [https://cebaf.jlab.org/files/ops/accboard/ MCC white board]
 
* [https://cebaf.jlab.org/files/ops/accboard/ MCC white board]
* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1635471172 Spreadsheet: number of triggers]
+
* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1635471172 Spreadsheet: number of triggers] -->
  
 
==Accelerator status ==
 
==Accelerator status ==
Line 295: Line 290:
  
 
==Hot Checkout ==
 
==Hot Checkout ==
# [https://accweb.acc.jlab.org/hco/reports/overall-status?destinationId=9&categoryId=401&systemId=&regionId=29&groupId=&qualified= Hot Check OUT Status]  <span style="color:green"> 100% ready </span>; <span style="color:#BABC3A">1% checked </span>; <span style="color:red">0% not ready  </span>
+
# [https://accweb.acc.jlab.org/hco/reports/overall-status?destinationId=9&categoryId=401&systemId=&regionId=29&groupId=&qualified= Hot Check OUT Status]  <span style="color:green"> 99% ready </span>; <span style="color:#BABC3A">1% checked </span>; <span style="color:red">0% not ready  </span>
  
==Readiness for Fall 18 run ==
 
<!--(This section is commented out for clarity) -->
 
  
*<strike>Solenoid (Eugene/Beni)
 
**Ramped to 100A, then 800A, and then back to 0A.
 
**Ready</strike>
 
**Waiting for accelerator firm delivery prediction to start ramping it up.
 
  
 +
==Readiness for Spring 19 run ==
 +
<!--(This section is commented out for clarity) -->
 +
*Solenoid (Eugene/Beni)
 +
**<strike>Started HCO. Done</strike>
 +
**<strike>Will test ramp to 300 A the magnet. Done</strike>
 +
**Will ramp the magnet for the run once beam is close to delivery.
 
*Surveys (Tim/Mark)
 
*Surveys (Tim/Mark)
***<strike>Diamonds: done
+
**(ComCal will be surveyed during the DIRC-PrimEx transition)
***TAC: done
+
**(The Be target will be surveyed during the DIRC-PrimEx transition)
***LH2 target: done
+
**<strike>DIRC, was surveyed Wednesday, Jan 30th and checked again on Monday (02/04).</strike>
***(DIRC, Monday 08/20)</strike>
+
*DAQ  (Sergei).  
 
+
**<strike>Implementing DIRC's scalers and their transfer to EPICS. Done. </strike>
*<strike>DAQ  (Sergei).  
+
**<strike>Beni started cosmic runs ⇒ Needed to power the detectors. Started on Jan. 30th. Things lookin good.</strike>
** Running and ready.
+
** Good sample of cosmic data was taken</strike>
+
 
+
 
*Trigger (Alex S.)  
 
*Trigger (Alex S.)  
**Need to test new software for FADC
+
**<font color="blue">During DIRC commissioning, trigger will be the same as for GlueX production runs.
 
+
**<strike> A LED trigger for DIRC need has been implemented and tested. It seems to be working. Justin checked that everything is fine. </strike>
 +
** <strike> DIRC readout has been integrated to the main physics trigger.  </strike></font>
 +
**<font color="magenta">During PrimEx-Eta run, trigger will be the same as for ComCal Fall 2018 commissioning.</font>
 +
**Implementing a new feature in SSP, to read the total energy from the crates for every 4ns bin. This would be for raw mode. The implementation is going well and may be available for this run. 
 +
**Need to set-up the CPP trigger. This will be done during the day allocated to CPP tests. Testing the special trigger should take about 2h of beam time.
 
*Beam line  
 
*Beam line  
**<strike>Diamond status (Tim/Hovanes). </strike>
+
**<strike>Beam pipe</strike>
**Tagger hodoscope (A. Somov)
+
***<strike> <font color="blue">Old beam pipe is installed and will be used for DIRC commissioning</font></strike>
**Tagger microscope (Beni/Richard Jones)
+
***<font color="magenta"><strike>New beam pipe to be installed during transition DIRC-PrimEx transition, and used for PrimEx-Eta run. The old pipe will be removed during the transition and there will be no beam pine during the PrimEx run</strike></font>
***All electronic has been turned on. Richard is checking the signals.  
+
**Diamond status (Tim/Hovanes).
**<strike>Goniometer (Hovanes).</strike>  
+
***<strike>Discussion to install a low quality thick diamond (U.Conn. inventory) for DIRC commissioning: Schedule is too tight. </strike>
**Collimator,<strike> Active collimator, profiler, luminosity monitor </strike>(Hovanes/Alexandre Deur).
+
**<strike>Tagger hodoscope (A. Somov)
***<strike> Act. Col. baselines have been zeroed mid July. Checked on 08/15: they have not changed significantly.</strike>
+
***Ready. There are several counters that are broken/have problems (see [https://logbooks.jlab.org/entry/3643240 logbook entry 3643240]. There is no spare nor time to fix them during the run. They will be dealt with at the calibration stage.
*** luminosity monitor usual location is incompatible with ComCal location.
+
***Sasha reminded us that the low-energy counters will need to be switched off during the DIRC high intensity runs.</strike>
 +
**Tagger microscope (Richard Jones/Beni)
 +
***<strike>Dark rate data taken Monday (Jan. 21st)</strike>
 +
**<strike>Goniometer (Hovanes).
 +
***Ready</strike>
 +
**Collimator Motion (Hovanes).
 +
**<strike>Active collimator detectors(Richard Jones/Alexandre Deur)
 +
*** Act. Col. baselines have been zeroed mid July 2018 and checked on 08/15. Stable enough. They don't need to be revisited for the Spring 2019 run.
 +
***Ready</strike>
 +
**Profiler
 +
**luminosity monitor (Hovanes).
 +
**Halo monitors
 +
***They have not been touched. They should be ready. To be checked.
 +
***Should be ready
 +
** luminosity monitor
 
**PS system (Alex Somov)  
 
**PS system (Alex Somov)  
**PS magnet (and sweeping magnet and tagger quads) will be ramped up by A. Deur when he cools the target.
+
***<strike>Ready.</strike>
**<strike>Polarimeter (Sebastian Cole/M. Dugger).  
+
**<strike>Beam line magnets (PS magnet sweeping magnet and tagger quads).</strike>
***Ready</strike>
+
**Polarimeter (Sebastian Cole/M. Dugger).  
**<strike>Target (Tim/Alexandre D.)  
+
**LH2 Target (Tim/Alexandre D.)  
***LH2 Target was cooled down (test). Target ready and HCO done. </strike>
+
***Target has been cool-down tested. It is working fine.  
***Now target is warmed again, to be cooled on Aug. 21st. Cooling the target takes 6h. It will remains empty (so that there is no need to man the counting room) and be filled when needed.
+
**Be target
***<font color="red"> Solid target status</font>
+
**<sup>4</sup>He target
**<strike>TAC (Hovanes/Alex Somov)  
+
**<strike>TAC (Hovanes/Alex Somov) </strike>
***Ready.
+
***<strike>Plan to cured after the Fall 2018 run was not performed.</strike> <!--To be done between spring 2019 and fall 2019 runs? -->
***TDC now working. </strike>
+
<!--****During TAC runs. TAC to be inserted on beam line with 2cm offset to avoid damaged area-->
****To be cured (oven) after the Fall 2018 run.
+
****During TAC runs to be inserted on beam line with 2cm offset to avoid damaged area
+
 
**Slow control (Hovanes).  
 
**Slow control (Hovanes).  
***Control for DIRC and ComCal to be done, when detectors are installed.  
+
***Working on DIRC. Missing Temperature voltages and callers from CODA. Some alarms are still missing.
**<strike>RF (Elton/Beni)</strike>
+
***<strike>ComCal. No new work needed. It is ready. </strike>
***Sergey F. found a flaky cable in the interface box. It is working for now but Sergey will contact Fernando about fixing this.   
+
**<strike>RF (Sergei)
 +
***Done: Checked with cosmic trigger. Looks fine</strike>
 
**<strike>Radiation monitors (Alexandre D.)
 
**<strike>Radiation monitors (Alexandre D.)
***Ready</strike>
+
***Operational</strike>
**<strike>Halo Monitors (Hovanes)
+
***Ready</strike>
+
 
*Detector systems
 
*Detector systems
 
**<strike>ST (Mark Ito)  
 
**<strike>ST (Mark Ito)  
***Ready</strike>
+
***Ready and tested (Beni)
 +
***<font color="blue">Will be used for DIRC commissioning</font>. <font color="magenta">Will remain in place for PrimEx-Eta run and used for the <sup>4</sup>He run, but will be turned off for the Be part of the run.</font>
 +
***Random trigger has been implemented (for Beni to monitor neutron radiation damage). </strike>
 
**<strike>FDC (Lubomir)   
 
**<strike>FDC (Lubomir)   
***One channel has failed and is turned off.
+
***Got cosmic trigger to get data. Things look fine.
***Ready</strike>
+
***Gas chromatograph installed near the gas panel. Connected to the FDC and CDD output line.
 +
***Chiller kept tripping. The problem was fixed by disabling an interlock. The other problem (communication. Maybe due to a IOC) went away. Reason unknown. In all, the chiller is operational.
 +
*** Lights for the camera near the bubbler/rotameter have been set-up (Hall's lights are dimmed because of DIRC).</strike>
 
**<strike>CDC (Beni)   
 
**<strike>CDC (Beni)   
***Ready</strike>
+
***Up and running.
**<strike>BCal (Elton/Mark D.)
+
***Flow controller replaced by a rotameter. It will be used from now on instead of the flow controller , unless we understand the origin of the green thing that clogged the flow controller.</strike>
***Ready</strike>
+
**<strike>BCal (Elton/Mark D.)  
** <strike> FCal (Collin Gleason)  
+
***Did LED run on March 29th. It looks good.
***Ready. HCO done.</strike>
+
***Will start HCO
**<strike>TOF (Mark Ito/Beni/Alex. Ostrovidov)   
+
***Low voltages issue (could not turn on) fixed: Two channels had the wrong parameter settings.</strike>
***Ready</strike>
+
**FCal (Collin Gleason)  
**DIRC (J. Stevens)
+
***BCal turned on fine. Need to turn on LED pulser to get some data.
***Water test successful.  
+
***One FADC module is dead and two modules have a bad channel. Sasha to replace the bad module on 02/06.
**ComCal (Alex Somov)
+
***<strike>HCO done</strike>
*<strike>Safety documents (Beni):  
+
**<strike><font color="magenta">ComCal (Alex Somov)
** RSAD and ESAD ready. </strike>
+
***Taking test LED data. They look fine.</font></strike>
 +
**<strike>TOF (Mark Ito/Beni)   
 +
***Ready: It was turned on and looked fine (Beni).
 +
***Checked baselines with cosmic data.
 +
***One HV broken was fixed (02/05) by Beni.</strike>
 +
**<font color="blue"><strike>DIRC (J. Stevens)
 +
***Fixed a few issues in the box (01/20th).  
 +
***Since 01/24th, everything is connected and readout with low rate trigger looks good.
 +
***Took high rate (LED) triggers. Looking at it. Need to keep taking LED data to set-up threshold for each channel. LED data will be taken until beam comes.</strike></font>
 +
*<strike>RSAD and ESAD Safety documents (Lubomir):  
 +
**Documents approved and ready for shift takers to sign.  
 +
**<font color="blue">DIRC replied ro readiness review recommendations on 01/25th.</font>
 +
**<font color="magenta">New ComCal OSP submitted and signed (the previous version expired March 2nd.) </font></strike>
 
*Phones  
 
*Phones  
**<font color="red"> System experts need to start carrying the on-call (charged) phones </font>
+
**System experts should have found their on-call phones by now.
 +
**System experts should have their phone charged.
 +
**<font color="red">System experts should start carrying their (charged) phone.</font>  
 
*Hall Status/safety (Mark/Tim)
 
*Hall Status/safety (Mark/Tim)
 
*Other topics?
 
*Other topics?
 
=== Run Planning Meetings Fall 2018 Running ===
 
*[[Run Planning Meetings Fall 2018 Running]]
 
 
=== Run Summaries ===
 

Latest revision as of 08:36, 10 April 2019

Spring 2019 GlueX Run

Meeting General Agenda

Run Planning Meeting Notes, Feb 6 - Feb 13, 2019
Run Planning Meeting Notes, Feb 14 - Feb 20, 2019
Run Planning Meeting Notes, Feb 21 - Feb 27, 2019
Run Planning Meeting Notes, Feb 28 - Mar 6, 2019
Run Planning Meeting Notes, Mar 7 - Mar 13, 2019
Run Planning Meeting Notes, Mar 14 - Mar 20, 2019
Run Planning Meeting Notes, Mar 21 - Mar 27, 2019
Run Planning Meeting Notes, Mar 28 - Apr 3, 2019
Run Planning Meeting Notes, Apr 4 - Apr 10, 2019
Run Planning Meeting Notes, Apr 11 - Apr 17, 2019

Connect Information

To connect from the outside by phone please do the following

1.) To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.

2.) To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.

3.) To join via phone, use one of the following numbers and the Conference ID: 660743227.

4.) The moderator code is 8394

Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada

Specific instructions for connecting from JLab's Hall D conference room:

  • Turn polycon on if necessary (do it before turning the computer on)
  • With the polycon, place a call at 199.48.152.152
  • Press # to enable the polycom keypad, then enter the meeting id: 660743227 and #
  • You may have to unmute the microphone: #*4
  • Turn the computer on if needed

Beam and Hall configuration

Information in blue is specifically for the DIRC commissioning

Information in magenta is specifically for the PrimEx-η run

  • Beam energy expected:
    • 11.630 GeV (10 MeV less than value for Fall 2016 to Fall 2018 up Nov. 15th, due to imbalanced linac setting).
  • Solenoid:
    • DIRC commissioning: 1350A
    • PrimEx-η run: off
  • CW Beam:
    • 250 MHz frequency.
    • Range:
      • DIRC commissioning: 50 nA-1.2 μA.
      • PrimEx-η run: 1 nA-500 nA.
    • Chopper slit: shared with Hall C until 03/10/2019. Then alone on slit A.
    • Standard current and radiators
      • DIRC: Standard commissioning current: 225 nA on 1.4·10-4 R.L. radiator (JD70-104 17 μm diamond).
      • DIRC: Hight intensity tests: 5 days at 1.2 μA on 1.4·10-4 R.L. radiator (JD70-104 17 μm diamond) (or 0.5 μA on JD70-105, 47 μm diamond of 3.9·10-4 R.L.)
      • PrimEx-η run: Standard production on 4He: 320 nA. on 10 µm Al (11.2·10-5 R.L.)
      • PrimEx-η run: Standard production on Be: 100 nA. on 10 µm Al (11.2·10-5 R.L.)
    • RSAD limit for most of the run, excluding high intensity tests: 1.3 μA on ·10-4 R.L. radiator for 5 days.
  • Position Slow Lock on or FFB on (FFB doesn't operate below 50nA).
  • Radiators:
    • Goniometer radiators:
      • Diamond JD70-104 (17 μm - 1.4·10-4 R.L., 7×7 mm²) - wider rocking curve - Tested in Spring 2018 and used at the beginning of Fall 2018. Probably has some radiation degradation.
      • Diamond JD70-105 (47 μm - 3.9·10-4 R.L., 7×7 mm²) - Used for the second part of GlueX's Fall 2018 run. Good performance.
    • 40 μm Al radiator (44.9·10-5 R.L.)
    • V-wire (for TAC run).
    • Amorphous
      • 1.64 µm Al (1.86·10-5 R.L., see study)</font>
      • 10 µm Al (11.2·10-5 R.L.)
      • 30 µm Al (33.7·10-5 R.L.)
  • Tagger quadrupole on (-4.2 A).
  • Collimator hole: Both 5 mm diameter and 3.4 mm diameter. Default running: 5.0 mm.
  • Miscellaneous:
    • CPP (Charged pion polarizability) shielding will be temporary installed.
    • Transition Radiation Detector in the Hall (Parasitic runs)

General Information

This document describes the run plan for the Hall D Spring 2019 run.

  • Schedule for the run (Updated 01/28/2019):
  1. Jan. 22nd - Feb 7th: Electron beam restoration. (Now pushed to Feb. 7th)
  2. Feb. 7thth - Feb. 20th: 2-weeks DIRC Commissioning (Solenoid at nominal field. LH2 target))
  3. Feb. 20th (tentatively!): 1 day of CPP test (Solenoid at nominal field. LH2 target)
    1. Move the FCAL platform downstream. Install the CPP shielding mount.
    2. Take data in 3 configurations: a) no shilding, b) 1 layer of shielding, 2 layers.
  4. Feb. 20th morning (tentatively!) - Apr. 15th: PrimEx-eta run . Tentative plan:
    1. Turn off the solenoid.
    2. Install the FCAL platform in the regular position. Remove the LH2 cell (leave only the shell). Remove ST. Reinstall the beam line.
    3. Take data for CCAL calibration at a low beam current. 3 shifts.
    4. Take PRIMEX data with no target. 1 shift.
    5. Intall Be target. Install ST (not connecting the cables). Fiducialize the Be target. Survey the target (is it needed?). Survey the CCAL in the central position.
    6. Take PRIMEX data. 5 shifts.
    7. Remove Be target, Install the LHe cell, install and connect the ST. Fiducialize the cell and survey the target.
    8. Take PRIMEX data with the empty LHe target (not cooling the target). 2 shifts.
    9. Cool and fill the LHe target.
    10. Take PRIMEX data till the end.


  1. Nominally, every Mondays: 12h of beam study. Every Tuesdays, if necessary: 8h of RF recovery.
  • Accelerator overall plan and priorities:
  1. Deliver physics beam to 4 halls. (Hall A stop early, on March. 10th. Halls B and or C will always be at 5th pass, so Hall D beam will always be RF-separated.)
  • DIRC commissioning page
  • PrimeX run plan
  • DAQ and Trigger high-intensity tests during DIRC commissioning.
  • CPP tests during last day of DIRC commissioning.
  • Parasitic TRD runs.
  • If opportunity arises, test fast raster beam envelope measurement with larger x-rastering (Richard Jones)
  • Strait track runs not expected to be needed

Runplan

  1. Verify electron beam quality and establish photon beam (assume 1 day).
    • Ion Chambers trip threshold must be set using Al. radiators
    • Tune electron beam with radiator retracted
      • Radiator (amorphous and diamond) must be retracted. Collimator should be in blocking position.
        • Typical levels are (for radiator retracted, collimator fully blocking, electron beam current 50 nA)
          • RAD102_P1 ~ 10 mrad/hr (tagger area, gammas, between tagger and dump)
          • RAD102_P2 < 0.1 mrad/hr (tagger area, gammas, on the ground below the goniometer).
          • RAD102_P3 ~ 0.3 mrem/hr (tagger area, neutrons, near electronics racks)
          • RAD508_P1 < 0.1 mrad/hr (collimator cave, gammas).
          • RAD508_P2 ~ 0. mrad/hr (Hall. Neutrons).
    • Establish good photon beam
    • Make sure tagger quadrupole is on and at -4.2 A. (It can be turned on only once the Hall is in power/beam permit.)
      • Insert 2*10-5 RL radiator. Call MCC and ask to mask the FSD and turn off beam each time a radiator is moved
        • Typical levels are (for 2×10-5 radiator, electron beam current 50 nA)
          • RAD102_P1= 35 mrad/hr (tagger area, gammas, between tagger and dump)
          • RAD102_P2= < 0.5 mrad/hr (tagger area, gammas, on the ground below the goniometer)
          • RAD102_P3= ~2 mrem/hr (tagger area, neutrons, near electronics racks)
          • RAD508_P1= ~10 mrad/hr (collimator cave, gammas).
          • RAD508_P2 < ~ 0. mrad/hr (Hall. Neutrons).
    • Verify beam position and envelope (Hovanes).
      • Ask MCC to set beam position on 5C11b to x=-0.5 mm and y=+1.0 mm.
      • Ask MCC for 5C11 and 5C11B HARP. Then do our radiator HARP scan, see instruction. If it looks good, proceed to next step. Otherwise, inform MCC.
      • Insert profiler (no need for masking FSD when an object is inserted in the photon line), run with 10×10-4 radiator and 50 nA. Beam on the profiler should be at x=0.0±0.5cm; y=0.0±0.5cm. If not, inform MCC.
    • Radiation level study (1h):
      • Run 5 min without radiator (Call MCC and ask to mask the FSD each time the radiator is moved). Beam current: 50nA. Repeat at 100 nA and 200 nA
      • Run 5 min with the 10-4 radiator (Call MCC). Beam current: 50nA. Repeat at 100 nA and 200 nA
      • Run 3 min with the 3*10-4 radiator (Call MCC). Beam current: 50nA. Repeat at 100 nA and 200 nA
    • Photon flux optimization and Active Collimator calibration. (20 + 20 mins). Call Hovanes.
      • re-Insert the 10-4 radiator (Call MCC). Use about 100 nA beam current. This will provide the Act. Col. nominal positions for its high gain values.
      • Determine maximum photon beam transmission by doing 2D scans using the collimator x/y motions (Hovanes. 1h)
      • Repeat procedure with 2*10-5 radiator (Call MCC) and 50 nA beam current. This will provide the Act. Col. nominal positions for its low gain values.
      • Record on the white board what is the beam position on 5C11b and Active Collimator for optimal photon transmission, both for low and high Act. Col. gain.
      • Until Hovanes determines to optimal 5C11b and Active Collimator position, keep profiler in and beam locked (MCC's duty) on the nominal 5C11b and x=0,y=0 profiler position. Once Active Collimator nominal beam position is known, retract profiler and lock the beam (MCC) on the active collimator.
  2. Detector and beamline checkout.
    • PS detector threshold scan. (A. Somov, 1h) Can be done early if necessary: nominal beam quality not mandatory.
    • Microscope yield study (row-by-row scan). (Richard Jones/Jim McIntyre, 1h) Can be done early if necessary: nominal beam quality not mandatory.
      • Call Richard Jones 20 min before the start of this task. Call Alex Somov to set-up the PS trigger.
      • Insert 5mm collimator.
      • Procedure to follow
      • Any type of beam quality will do.
      • 10-4 radiator, 10-3 convertor, 80 nA beam current.
    • Reestablish L1 trigger Alex. Somov. 2h).
    • Reestablish DAQ (Sergei, 2h).
    • General detector calibration (Sean Dobbs. 1h). Use 10-4 radiator.
      • Run 15 min (solid time) in Long Mode (Mode 10)
      • Run 15 min (solid time) in Production Mode (Mode 9).
  3. Check 17 μm diamond (JD70-104) alignement. (We expect to use 2 polarization configuration only) (Hovanes. 1h).
  4. DIRC commissioning
    • DIRC commissioning page
    • Standard configuration: 17 μm diamond, 225 nA (1.2 μA for high intensity run), 5 mm hole, TPol on (for TPol syst. studies. Not necessary for DIRC) 75 μm TPol convertor??. 2h runs and no more, as it may be hard to correct for calibration drifts. Cycle over 3 sets of runs: ∣∣, then ⊥, then amorphous runs (i.e. two diamond settings only). DAQ start run overhead: 3min.
    • Luminosity scans on amorphous radiator. 50-300 nA. Use 10 µm Al (1.12·10-4 R.L.), on amorphous radiator ladder.
    • Tagger quadrupole on
    • Harp scan (30 min): Only once in the middle of the DIRC commissioning (beside the ones done during beam set-up).
    • One Empty target run (2h: 1- h to empty/fill back the target, 1h running). Standard production current.
    • Long mode 10 min run. Twice or Thrice a week. Beam must be off. On opportunistic basis if possible (Purpose: monitor neutron radiation damage to ST due to nuclear target higher neutron yield.)
    • No TAC run necessary
  5. Transition to PrimEx-η
    • CPP (Charged pion polarizability) tests (Not firm yet.)
      • To be set-up and done during the last day of DIRC allocated commissioning time.
      • Use LH2 target, keep solenoid on at nominal field, DIRC stays in nominal position.
      • Move downstream platform downstream
      • Install passive shielding in front of TOF.
      • Set-up and check specific CPP trigger: 2h (Alex Somov).
      • Tests (to be done for various thicknesses of passive shielding).
      • End of test: ramp down solenoid, remove shielding.
  6. PrimEx-η
    • PrimEx-η runplan page
    • Standard configuration: 10 µm Al (11.2·10-5 R.L. Beam current depends on target. 2h runs and no more, as it may be hard to correct for calibration drifts</font>. DAQ start run overhead: 3min.
    • Two TAC runs (to be done with the TAC detector, not with ComCal).
      • First one: shortly after March 10th, once we Hall A is down and we run on the Hall A slit.
      • Second one: near the end of the run.
      • HARP scan (only Hall D harp): 10 min. Every two days.
    • Long mode 10 min run. Twice or Thrice a week. Beam must be off. On opportunistic basis if possible (Purpose: monitor neutron radiation damage to ST due to nuclear target higher neutron yield.)

Hall D situation room (current run plan)

Hall D counting room white board


Runplan time charts

Spring 2019 time chart:

Spring19 week1.jpg

Spring 2019 commissioning/run time chart. Week 1.
The horizontal scale is the time during which beam is available (in other words, it would be the real time with 100% of beam efficiency).
The task time estimates given on the plot have 100% contingency.

FSpring19 week2.jpg

Run time chart. Week 2.

FSpring19 week3.jpg

Run time chart. Week 3.


Accelerator status

Hot Checkout

  1. Hot Check OUT Status 99% ready ; 1% checked ; 0% not ready


Readiness for Spring 19 run

  • Solenoid (Eugene/Beni)
    • Started HCO. Done
    • Will test ramp to 300 A the magnet. Done
    • Will ramp the magnet for the run once beam is close to delivery.
  • Surveys (Tim/Mark)
    • (ComCal will be surveyed during the DIRC-PrimEx transition)
    • (The Be target will be surveyed during the DIRC-PrimEx transition)
    • DIRC, was surveyed Wednesday, Jan 30th and checked again on Monday (02/04).
  • DAQ (Sergei).
    • Implementing DIRC's scalers and their transfer to EPICS. Done.
    • Beni started cosmic runs ⇒ Needed to power the detectors. Started on Jan. 30th. Things lookin good.
  • Trigger (Alex S.)
    • During DIRC commissioning, trigger will be the same as for GlueX production runs.
    • A LED trigger for DIRC need has been implemented and tested. It seems to be working. Justin checked that everything is fine.
    • DIRC readout has been integrated to the main physics trigger.
    • During PrimEx-Eta run, trigger will be the same as for ComCal Fall 2018 commissioning.
    • Implementing a new feature in SSP, to read the total energy from the crates for every 4ns bin. This would be for raw mode. The implementation is going well and may be available for this run.
    • Need to set-up the CPP trigger. This will be done during the day allocated to CPP tests. Testing the special trigger should take about 2h of beam time.
  • Beam line
    • Beam pipe
      • Old beam pipe is installed and will be used for DIRC commissioning
      • New beam pipe to be installed during transition DIRC-PrimEx transition, and used for PrimEx-Eta run. The old pipe will be removed during the transition and there will be no beam pine during the PrimEx run
    • Diamond status (Tim/Hovanes).
      • Discussion to install a low quality thick diamond (U.Conn. inventory) for DIRC commissioning: Schedule is too tight.
    • Tagger hodoscope (A. Somov)
      • Ready. There are several counters that are broken/have problems (see logbook entry 3643240. There is no spare nor time to fix them during the run. They will be dealt with at the calibration stage.
      • Sasha reminded us that the low-energy counters will need to be switched off during the DIRC high intensity runs.
    • Tagger microscope (Richard Jones/Beni)
      • Dark rate data taken Monday (Jan. 21st)
    • Goniometer (Hovanes).
      • Ready
    • Collimator Motion (Hovanes).
    • Active collimator detectors(Richard Jones/Alexandre Deur)
      • Act. Col. baselines have been zeroed mid July 2018 and checked on 08/15. Stable enough. They don't need to be revisited for the Spring 2019 run.
      • Ready
    • Profiler
    • luminosity monitor (Hovanes).
    • Halo monitors
      • They have not been touched. They should be ready. To be checked.
      • Should be ready
    • luminosity monitor
    • PS system (Alex Somov)
      • Ready.
    • Beam line magnets (PS magnet sweeping magnet and tagger quads).
    • Polarimeter (Sebastian Cole/M. Dugger).
    • LH2 Target (Tim/Alexandre D.)
      • Target has been cool-down tested. It is working fine.
    • Be target
    • 4He target
    • TAC (Hovanes/Alex Somov)
      • Plan to cured after the Fall 2018 run was not performed.
    • Slow control (Hovanes).
      • Working on DIRC. Missing Temperature voltages and callers from CODA. Some alarms are still missing.
      • ComCal. No new work needed. It is ready.
    • RF (Sergei)
      • Done: Checked with cosmic trigger. Looks fine
    • Radiation monitors (Alexandre D.)
      • Operational
  • Detector systems
    • ST (Mark Ito)
      • Ready and tested (Beni)
      • Will be used for DIRC commissioning. Will remain in place for PrimEx-Eta run and used for the 4He run, but will be turned off for the Be part of the run.
      • Random trigger has been implemented (for Beni to monitor neutron radiation damage).
    • FDC (Lubomir)
      • Got cosmic trigger to get data. Things look fine.
      • Gas chromatograph installed near the gas panel. Connected to the FDC and CDD output line.
      • Chiller kept tripping. The problem was fixed by disabling an interlock. The other problem (communication. Maybe due to a IOC) went away. Reason unknown. In all, the chiller is operational.
      • Lights for the camera near the bubbler/rotameter have been set-up (Hall's lights are dimmed because of DIRC).
    • CDC (Beni)
      • Up and running.
      • Flow controller replaced by a rotameter. It will be used from now on instead of the flow controller , unless we understand the origin of the green thing that clogged the flow controller.
    • BCal (Elton/Mark D.)
      • Did LED run on March 29th. It looks good.
      • Will start HCO
      • Low voltages issue (could not turn on) fixed: Two channels had the wrong parameter settings.
    • FCal (Collin Gleason)
      • BCal turned on fine. Need to turn on LED pulser to get some data.
      • One FADC module is dead and two modules have a bad channel. Sasha to replace the bad module on 02/06.
      • HCO done
    • ComCal (Alex Somov)
      • Taking test LED data. They look fine.
    • TOF (Mark Ito/Beni)
      • Ready: It was turned on and looked fine (Beni).
      • Checked baselines with cosmic data.
      • One HV broken was fixed (02/05) by Beni.
    • DIRC (J. Stevens)
      • Fixed a few issues in the box (01/20th).
      • Since 01/24th, everything is connected and readout with low rate trigger looks good.
      • Took high rate (LED) triggers. Looking at it. Need to keep taking LED data to set-up threshold for each channel. LED data will be taken until beam comes.
  • RSAD and ESAD Safety documents (Lubomir):
    • Documents approved and ready for shift takers to sign.
    • DIRC replied ro readiness review recommendations on 01/25th.
    • New ComCal OSP submitted and signed (the previous version expired March 2nd.)
  • Phones
    • System experts should have found their on-call phones by now.
    • System experts should have their phone charged.
    • System experts should start carrying their (charged) phone.
  • Hall Status/safety (Mark/Tim)
  • Other topics?