Difference between revisions of "Run Coordination Meetings:Spring2023"

From GlueXWiki
Jump to: navigation, search
Line 41: Line 41:
 
** 250 MHz frequency.  
 
** 250 MHz frequency.  
 
** Range: 1 nA-900
 
** Range: 1 nA-900
** Chopper slit: <font color="red"> TBD </font>
+
** Chopper slit: <font color="red"> TBD (assume C, since Hall C will be at 5-pass all the time)</font>
 
**Standard current and radiators
 
**Standard current and radiators
 
***~350 nA on a 4.1&middot;10<sup>-4</sup> R.L. radiator (50 μm diamond). (RSAD limit 500nA on 58 μm diamond)) <font color="red"> Is this still valid? </font>
 
***~350 nA on a 4.1&middot;10<sup>-4</sup> R.L. radiator (50 μm diamond). (RSAD limit 500nA on 58 μm diamond)) <font color="red"> Is this still valid? </font>
Line 70: Line 70:
 
**Other?
 
**Other?
  
 +
==General Information==
  
 +
This document describes the run plan for the Hall D Spring 2023 run.
 +
* Schedule for the run (see [https://www.jlab.org/sites/default/files/user-liaison/files/Scheduing-Memo-20220724.pdf July 2022-March 2024 official schedule]):
 +
# January 5th -12th: Electron beam restoration.
 +
# January 12th - March 20th: 10  weeks for GlueX high luminosity production.
 +
 +
* Accelerator overall plan and priorities: Deliver physics beam to 4 halls
 +
**Hall A, always at 4-pass, is scheduled stop early, on March. 13th.
 +
**Halls B and or C will always be at 5-pass
 +
 +
*Hall D plan <font color="red"> Tentative guess </font>
 +
**Experiment: GlueX-II [https://misportal.jlab.org/mis/physics/experiments/viewProposal.cfm?paperId=834 E12-12-002]
 +
**One (?) TAC run.
 +
**Two (?) empty target runs (One at the start of the run, the other consecutive to TAC run)
 +
** Straight track run (?)
 +
***Overall, one night of good data.
 +
**Opportunistic tests?
 +
 +
* Expected Staffing and responsibilities:
 
**The Run Coordinator oversees the run:  
 
**The Run Coordinator oversees the run:  
 
*** January 12 - 18, 6 days: Joerg Reinhold
 
*** January 12 - 18, 6 days: Joerg Reinhold

Revision as of 16:13, 8 December 2022

Spring 2023 Run

Run Statistics Google Spreadsheet. 

GlueX experiment (January 12 - March 20 2023)


Connect Information

To connect from the outside by phone please do the following

1.) To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.

2.) To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.

3.) To join via phone, use one of the following numbers and the Conference ID: 660743227.

4.) The moderator code is 8394

Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada

Specific instructions for connecting from JLab's Hall D conference room:

  • Turn polycon on if necessary (do it before turning the computer on)
  • With the polycon, place a call at 199.48.152.152
  • Press # to enable the polycom keypad, then enter the meeting id: 660743227 and #
  • You may have to unmute the microphone: #*4
  • Turn the computer on if needed

Beam and Hall configuration

  • Beam energy expected:
    • 11.55 GeV
  • Solenoid:
    • 1350A
  • CW Beam:
    • 250 MHz frequency.
    • Range: 1 nA-900
    • Chopper slit: TBD (assume C, since Hall C will be at 5-pass all the time)
    • Standard current and radiators
      • ~350 nA on a 4.1·10-4 R.L. radiator (50 μm diamond). (RSAD limit 500nA on 58 μm diamond)) Is this still valid?
      • ~350 nA on a 33.7·10-5 R.L. AL radiator (30 µm Al). (RSAD limit 600nA on 30 µm Al radiator))
  • Position Slow Lock on or FFB on (FFB doesn't operate below 50nA).
  • Radiators:
    • Goniometer radiators:
      • Diamond TBD
      • Amorphous 40 μm Al radiator (44.9·10-5 R.L.)
      • V-wire (for TAC run).
    • Amorphous
      • 1.64 µm Al (1.86·10-5 R.L., see study)
      • 10 µm Al (11.2·10-5 R.L.)
      • 30 µm Al (33.7·10-5 R.L.)
  • Tagger quadrupole on (-4.2 A).
  • Collimator hole: Default running: 5.0 mm.