Difference between revisions of "Run Coordination Meetings: Fall 2014"
From GlueXWiki
(→Meeting General Agenda) |
(→Meeting General Agenda) |
||
Line 30: | Line 30: | ||
#*<span style="color:blue"> Halo Counter installed. Check with Machine Shop (Reassess Wed. 17th)</span> | #*<span style="color:blue"> Halo Counter installed. Check with Machine Shop (Reassess Wed. 17th)</span> | ||
#*<span style="color:red">Tagger shielding </span> | #*<span style="color:red">Tagger shielding </span> | ||
− | #*<span style="color:red">Pair Spectrometer remote control | + | #*<span style="color:red">Pair Spectrometer remote control</span>; <span style="color:blue">Field readout </span> |
#*<span style="color:red">Survey: | #*<span style="color:red">Survey: | ||
#** FDC under field | #** FDC under field | ||
Line 39: | Line 39: | ||
#**Pair Spectrometer detector | #**Pair Spectrometer detector | ||
#**Pair Spectrometer Harp</span> | #**Pair Spectrometer Harp</span> | ||
− | #*<span style="color:red"> </span> | + | #*<span style="color:red">Vacuum </span> |
− | #*<span style="color:red"> </span> | + | #*<span style="color:red">Solenoid magnet power (Test Mon 15th, 1000A Wed. 17th.) </span> |
− | #*<span style="color:red"> </span> | + | #*<span style="color:red">Amorphous Radiators (Dave Butler to wire up. FSD?)</span> |
− | #*<span style="color:red"> </span> | + | #*<span style="color:red">2nd sweep magnet. (2nd collimator aperture). No required for Fall run. </span> |
#*<span style="color:green"> </span> | #*<span style="color:green"> </span> | ||
#*<span style="color:blue"> </span> | #*<span style="color:blue"> </span> |
Revision as of 16:27, 12 September 2014
General information
Daily Meetings, 8:45am, Hall D conference room. Held by the Run Coordinator.
Connect Information
To connect from the outside by phone please do the following
1.) To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
2.) To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
3.) To join via phone, use one of the following numbers and the Conference ID: 660743227.
Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada
4.) More information on connecting to bluejeans is available. The old ESNET and SeeVough Information is archived here.
Meeting General Agenda
- Report relevant updates from 7:50 and 8:00 daily MCC meetings
- Report on yesterday Hall D related events
- Hot Check OUT Status
- Installation punch list (items in red: must by Sept 22nd ; Blue: Done by 2nd Fall run; Green: Nice to have it
- Pair converter operational
- Pair spectrometer detector surveyed
- Profile monitors
- Active collimator: Checked-Installed-Readout
- Target/Start Counter Installed/Surveyed (Tuesday 16th need ground cable)
- Halo Counter installed. Check with Machine Shop (Reassess Wed. 17th)
- Tagger shielding
- Pair Spectrometer remote control; Field readout
- Survey:
- FDC under field
- Profiler
- Start counter
- Collimator
- FCal
- Pair Spectrometer detector
- Pair Spectrometer Harp
- Vacuum
- Solenoid magnet power (Test Mon 15th, 1000A Wed. 17th.)
- Amorphous Radiators (Dave Butler to wire up. FSD?)
- 2nd sweep magnet. (2nd collimator aperture). No required for Fall run.
- Specific safety notice (from Tom/Tim/Mark)