Difference between revisions of "Run Coordination Meetings: Fall 2014"

From GlueXWiki
Jump to: navigation, search
(Meeting General Agenda)
Line 29: Line 29:
 
== Meeting General Agenda ==
 
== Meeting General Agenda ==
  
# Report relevant updates from 7:50 and 8:00 daily MCC meetings: Hall will close before 4pm for PSS certification. Discussion this afternoon on accelerator schedule to accommodate cold box leak repair. Next meeting will be 10am.  
+
# Report relevant updates from 7:50 and 8:00 daily MCC meetings: Accelerator schedule: most optimistic plan is to get beam in the injector on Oct. 6th. They are still investigating the cold box vacuum problem.
 
# Report on yesterday Hall D related events
 
# Report on yesterday Hall D related events
 
# [https://accweb.acc.jlab.org/hco/reports/overall-status?destinationId=9&systemId=&regionId=29&groupId= Hot Check OUT Status]  
 
# [https://accweb.acc.jlab.org/hco/reports/overall-status?destinationId=9&systemId=&regionId=29&groupId= Hot Check OUT Status]  
 
# Installation punch list (items in<span style="color:red"> red: must by Sept 22nd  </span>; Blue: <span style="color:blue"> Done by 2nd Fall run</span>;  <span style="color:green"> Green: Nice to have it</span>
 
# Installation punch list (items in<span style="color:red"> red: must by Sept 22nd  </span>; Blue: <span style="color:blue"> Done by 2nd Fall run</span>;  <span style="color:green"> Green: Nice to have it</span>
#*<span style="color:red"> Pair converter</span> Tom to get the photon harp wire, shipped by Carnegie-Mellon, from Shipping and Receiving
+
#*<span style="color:red"> Pair converter</span> Tom got the photon harp wire shipped by Carnegie-Mellon. He will put the wire in today, close the chamber and start vacuum pumping.
#*<span style="color:red"> Pair spectrometer detector</span> - To be surveyed today.
+
#*<span style="color:red"> Pair spectrometer detector</span> - Positioned on the stand. Survey is still ongoing today. All bad channels have been replaced. 
#*<span style="color:red"> Profile monitors</span> - one installed, one to be installed, readout work-in-progress
+
#*<span style="color:red"> Profile monitors</span> - The two profilers are now installed. Readout work-in-progress
#*<span style="color:red">Active collimator</span> - being checked
+
#*<span style="color:red">Active collimator</span> - Alex S. will talk to Trent today to check on progress.
#*<span style="color:red">Target/Start Counter</span> - To be surveyed on Thursday or Friday
+
#*<span style="color:red">Target/Start Counter</span> - SC had to be dismounted to fix light leaks. Will be mounted back Friday and be surveyed on Monday or Tuesday.
#*<span style="color:red">Tagger shielding</span> - to be installed on Saturday
+
#*<span style="color:red">Tagger shielding</span> - to be installed next week or the week after, depending on the accelerator schedule. Will be mounted as later as possible.
#*<span style="color:red">Pair Spectrometer Magnet remote control</span> - Communication established for remote control. Hovanes to meet tomorrow at 2pm with accelerator.
+
#*<span style="color:red">Pair Spectrometer Magnet remote control</span> - Hovanes to meet today at 2pm with accelerator (Gary). Meeting may be postponed to tomorrow due to interference with Hall survey.
#*<span style="color:blue"> Field readout</span> Hall probe arrived Yesterday. - To be installed by Trent Allison once active collimator is ready.
+
#*<span style="color:blue">Pair Spectrometer Magnet Field readout</span> Hall probe is here and will be installed by Wes. We should have a field reading for the commissioning.
 
#*<span style="color:red">Survey:</span>
 
#*<span style="color:red">Survey:</span>
 
#** FDC under field - Wednesday
 
#** FDC under field - Wednesday

Revision as of 15:24, 18 September 2014

General information

Daily Meetings, 8:45am, Hall D conference room. Held by the Run Coordinator.

Connect Information

To connect from the outside by phone please do the following

1.) To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.

2.) To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.

3.) To join via phone, use one of the following numbers and the Conference ID: 660743227.

4.) The moderator code is 8394

Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada

4.) More information on connecting to bluejeans is available. The old ESNET and SeeVough Information is archived here.

Specific instructions for connecting from JLab's Hall D conference room:

  • Turn polycon on if necessary (do it before turning the computer on)
  • With the polycon, place a call at 199.48.152.152
  • Press # to enable the polycom keypad, then enter the meeting id: 660743227 and #
  • You may have to unmute the microphone: #*4
  • Turn the computer on if needed

Meeting General Agenda

  1. Report relevant updates from 7:50 and 8:00 daily MCC meetings: Accelerator schedule: most optimistic plan is to get beam in the injector on Oct. 6th. They are still investigating the cold box vacuum problem.
  2. Report on yesterday Hall D related events
  3. Hot Check OUT Status
  4. Installation punch list (items in red: must by Sept 22nd ; Blue: Done by 2nd Fall run; Green: Nice to have it
    • Pair converter Tom got the photon harp wire shipped by Carnegie-Mellon. He will put the wire in today, close the chamber and start vacuum pumping.
    • Pair spectrometer detector - Positioned on the stand. Survey is still ongoing today. All bad channels have been replaced.
    • Profile monitors - The two profilers are now installed. Readout work-in-progress
    • Active collimator - Alex S. will talk to Trent today to check on progress.
    • Target/Start Counter - SC had to be dismounted to fix light leaks. Will be mounted back Friday and be surveyed on Monday or Tuesday.
    • Tagger shielding - to be installed next week or the week after, depending on the accelerator schedule. Will be mounted as later as possible.
    • Pair Spectrometer Magnet remote control - Hovanes to meet today at 2pm with accelerator (Gary). Meeting may be postponed to tomorrow due to interference with Hall survey.
    • Pair Spectrometer Magnet Field readout Hall probe is here and will be installed by Wes. We should have a field reading for the commissioning.
    • Survey:
      • FDC under field - Wednesday
      • Profiler
      • Start counter
      • Collimator
      • FCal
      • Pair Spectrometer detector
      • Pair Spectrometer Harp
    • Vacuum - Backing-up. On schedule
    • Solenoid magnet power - tested, 1000 A today
    • Amorphous Radiators - Signal in PLC. Accelerator has the signal and would shut down the beam if radiator moves out of limit ("slow" shut down). Will be put on FSD by Oct. 1st.
    • Halo Counter - Every piece is now at JLab. Should be assembled by Monday 22nd
    • Microscope - Deciding today how to air cooling it. Then, mechanically ready.
    • Tagger crates - readout being checked
    • Hodoscope checks - Franz and Nathan to check them today. Notice: Hall will close before 4pm for PSS certification
    • 2nd sweep magnet. (2nd collimator aperture) - not required for Fall run.
  5. Specific safety notice (from Tom/Tim/Mark): Solenoid Field to be ramped up (1000A). When working in the Hall near the solenoid, regardless if it is on or off, please make sure to not leave any magnetic tools or items after you are done with your work.