General information

Weekly Meetings, 8:45am, Wednesdays, Hall D conference room. Held by the Run Coordinator. Present Run Coordinator: Alexandre Deur

Connect Information

To connect from the outside by phone please do the following

1.) To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.

2.) To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.

3.) To join via phone, use one of the following numbers and the Conference ID: 660743227.

4.) The moderator code is 8394

Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada

4.) More information on connecting to bluejeans is available. The old ESNET and SeeVough Information is archived here.

Specific instructions for connecting from JLab's Hall D conference room:

  • Turn polycon on if necessary (do it before turning the computer on)
  • With the polycon, place a call at 199.48.152.152
  • Press # to enable the polycom keypad, then enter the meeting id: 660743227 and #
  • You may have to unmute the microphone: #*4
  • Turn the computer on if needed

Meeting General Agenda

Jan. 15th 2015 meeting

  1. Report relevant updates from 7:50 and 8:00 daily MCC meetings:
    • Accelerator schedule: No daily/weekly MCC meetings. Expected schedule:
    1. Feb. 13 - Feb. 26: Beam restoration (13 days)
    2. Feb. 27 - March 26: Accelerator development. Physics running conditions are similar to Fall 2014: Accelerator has priority. Possible running for Halls A/B/D.
    3. Apr. 3 - May 4: Physics run (Halls A/B/D).
  2. Report on Work in the Hall:
    • If you have work to do in the Hall, please notify Tom (Hall work coordinator) and if necessary, document it in the electronic logbook.
    • The upstream platform is now a hearing protection area. Hall D is a radiation aread. OSL need to be worn everywhere in Hall D.
  3. Hot Check OUT Status 13% ready ; 68% checked ; 18% not ready
  4. Spring 2015 runplan
  5. Commissioning readiness
  6. Installation punch list (items in red: must be done by ----- ; Blue: must be done by ----- ; Green: Nice to have it
    • Reset HCO
    • LH2 Target
      • Installation
      • Controls
    • Goniometer
      • Build and install a frame at JLab for testing controls/tune procedure -
      • Procure a test diamond (Hall B? thick 300 μm diamond? for initial tests -
      • Controls
      • Establish the tune procedure (Ken L.)
      • Install nominal diamonds (sometimes in April)-
    • Active collimator (remains in its current position in front of 5mm hole and attached to primary collimator) -
      • Test installation in front of 3.4 mm hole
      • Check alignment
    • Upstream profiler installed on an remotely controlled insertable holder
    • downstream profiler
      • refurbished/remade
      • Installed/tested/surveyed
    • Survey
      • Realign photon beam line after bellow installation
      • P.S. detectors
      • TAC
      • LH2/start counter
      • Diamond
      • Photon Polarimeter
      • Solenoid (in case of floor settling)
      • Upstream profiler
    • Solenoid
      • Power supply maintenance
      • Flow controler
      • Ground fault fuse monitoring
    • Start Counter
      • Remove the piece of tape in the beam path. (Eric P.)
      • Reinstall by end of January. Operational for cosmic runs
      • Check alignment (no tilt)
    • FDC
      • Chiller back by end of Feb.
      • Implement safety switch
    • CDC
      • Cable re-routing
      • Ready for Cosmic (BCal trigger)
    • Pair Spec.
      • Fix ≈10 chanels.
      • Have a user-friendly gui
    • FCal
      • Improve GUI
    • TOF
      • Voltage Range
    • Shielding
      • Tagger
        • Improve shielding at entrance of tagger magnet
        • shield e- beam flange
        • Shield near tagger rack
      • Collimator cave: shield gamma probe
    • Radiation monitor
      • Installed new radiation monitors
      • Lay cables for new neutron probe downstream of Solenoid
    • Trigger
      • Trigger connection to TDC (Beni)
      • Firmware update
      • Change jumper in distribution board (Alex S.)?
      • Fix F125 firmware problem
    • DAQ: Multiblock mode run at ≈20 kHz
    • Online
      • Fix high rate freeze
      • Upgrade O.S. (Red Hat 7) ?
      • Improve software for scaler readout (Mark D.)
    • Accelerator RF timing (Elton/Fernando)
    • Photon polarimeter
      • Installation
      • Control
    • TAC
    • Phone Spring repeater. Run w/ and w/o it
  7. Specific safety notice (from Tom/Tim/Mark):