(Created page with "We started an extensive lumi scan program that will last over thanks giving.<br> The intensity scan involves the following runs: 51643-51682, 51688-51721 [https://halldweb.jla...") |
|||
(3 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
We started an extensive lumi scan program that will last over thanks giving.<br> | We started an extensive lumi scan program that will last over thanks giving.<br> | ||
The intensity scan involves the following runs: 51643-51682, 51688-51721 | The intensity scan involves the following runs: 51643-51682, 51688-51721 | ||
− | [https://halldweb.jlab.org/wiki/index.php/RunPeriod-2018-08_Validation see also here] | + | [https://halldweb.jlab.org/wiki/index.php/RunPeriod-2018-08_Validation see also here] <br> |
+ | [https://logbooks.jlab.org/entry/3630797 and here] <br> | ||
+ | [https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit#gid=1035143529 Final Run Plan spread sheet]<br> | ||
+ | Sat. Nov 24th an hole in the FCAL is seen and finally traced back to a faulty FADC which was later replaced by Sasha.<br> | ||
+ | After the week-end on Monday we started installation of CompCal.<br> |
Latest revision as of 16:58, 9 January 2019
We started an extensive lumi scan program that will last over thanks giving.
The intensity scan involves the following runs: 51643-51682, 51688-51721
see also here
and here
Final Run Plan spread sheet
Sat. Nov 24th an hole in the FCAL is seen and finally traced back to a faulty FADC which was later replaced by Sasha.
After the week-end on Monday we started installation of CompCal.