(Created page with "RC summary, 08/27/2020 - 09/02/2020, Igal Jaegle During the first 4 days, we were in data production more and for the last 3 days were devoted to CPP tests & DIRC commissioni...")
 
Line 3: Line 3:
 
During the first 4 days, we were in data production more and for the last 3 days were devoted to CPP tests & DIRC commissioning.
 
During the first 4 days, we were in data production more and for the last 3 days were devoted to CPP tests & DIRC commissioning.
 
The downtime due to us was large: 38.8hr
 
The downtime due to us was large: 38.8hr
#*12hr hall access for installing the CPP test
+
*12hr hall access for installing the CPP test
#*14hr hall access for de-installing the CPP test and installing TRD-GEM
+
*14hr hall access for de-installing the CPP test and installing TRD-GEM
#*12.8hr invasive hall access for detector (DIRC) repair, active collimator scan, changing radiator, and starting runs
+
*12.8hr invasive hall access for detector (DIRC) repair, active collimator scan, changing radiator, and starting runs

Revision as of 20:07, 12 September 2020

RC summary, 08/27/2020 - 09/02/2020, Igal Jaegle

During the first 4 days, we were in data production more and for the last 3 days were devoted to CPP tests & DIRC commissioning. The downtime due to us was large: 38.8hr

  • 12hr hall access for installing the CPP test
  • 14hr hall access for de-installing the CPP test and installing TRD-GEM
  • 12.8hr invasive hall access for detector (DIRC) repair, active collimator scan, changing radiator, and starting runs