RC summary, 09/17/2020 - 09/21/2020, Igal Jaegle | RC summary, 09/17/2020 - 09/21/2020, Igal Jaegle | ||
− | Dung the last 6 days of the summer run, the beam was stable and we took production data, and carried out two tests: PS and CCAL. The downtime was 10.4hrs | + | Dung the last 6 days of the summer run, the beam was stable and we took production data, and carried out two tests: PS and CCAL. The downtime was 10.4hrs. |
* Physics production: total 18.06B - perp 8.18B para 7.86B amo 2.02B | * Physics production: total 18.06B - perp 8.18B para 7.86B amo 2.02B |
Revision as of 09:10, 6 October 2020
RC summary, 09/17/2020 - 09/21/2020, Igal Jaegle
Dung the last 6 days of the summer run, the beam was stable and we took production data, and carried out two tests: PS and CCAL. The downtime was 10.4hrs.
- Physics production: total 18.06B - perp 8.18B para 7.86B amo 2.02B
- PS study for flux normalization
- CCAL test with 2nA beam to test new active basis
The most notable issues were
- Goniometer controler board has to be replaced
- It was difficult to nudge the coherent peak probably because the diamond degraded
- Few FCAL bases have to be replaced
- Minor DAQ problem