RC summary, Feb. 21st -Feb. 27th 2019

This period was mostly devoted to the start of the Primex program, with time devoted to several dedicated studies. At the start of my tenure as Run Coordinator, we dedicated two shifts to some dedicated tests for the CPP experiment, in which movable lead shielding was installed in front of the TOF. These tests were completed successfully, and the setup was reconfigured the next morning from the Primex experiment.