(Thursday, November 10)
(Past 24 hours)
Line 13: Line 13:
  
 
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.
 
* No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator are somewhat larger and lie outside the expected range, need to monitor PS rates.
+
* Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator are somewhat larger and lie outside the preferred range, need to monitor PS rates.
* Took production data on Full LHe target whenever we there is a beam. Since yesterday we collected 1.9 B events.
+
* Took production data on Full LHe target. Since yesterday we collected 1.9 B events.
  
 
=== Shift Summary ===
 
=== Shift Summary ===

Revision as of 08:06, 10 November 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Thursday, November 10

Past 24 hours

  • No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.
  • Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator are somewhat larger and lie outside the preferred range, need to monitor PS rates.
  • Took production data on Full LHe target. Since yesterday we collected 1.9 B events.

Shift Summary

Issues/Reports

  • No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.

Plan

  • Continue with Full target production.