Difference between revisions of "Run Planning Meeting Noters, November 9- November 16, 2022"

From GlueXWiki
Jump to: navigation, search
(Past 24 hours)
(Shift Summary)
Line 20: Line 20:
  
 
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]
 
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ]
* [https://logbooks.jlab.org/entry/4078809 Swing Nov 9]
+
* [https://logbooks.jlab.org/entry/4079301 Swing Nov 9]
* [https://logbooks.jlab.org/entry/4078915 Owl Nov9/10]
+
* [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10]
* [https://logbooks.jlab.org/entry/4079038 Early riser Nov 10]
+
* [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10]
  
 
=== Issues/Reports ===
 
=== Issues/Reports ===

Revision as of 08:09, 10 November 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Thursday, November 10

Past 24 hours

  • No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.
  • Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator are somewhat larger and lie outside the preferred range, need to monitor PS rates.
  • Took production data on Full LHe target. Since yesterday we collected 1.9 B events.

Shift Summary

Issues/Reports

  • No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.

Plan

  • Continue with Full target production.