=== Issues/Reports ===
 
=== Issues/Reports ===
 
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.
 
* No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.
 +
* After the beam was back it was mostly stble besides some FSD trips.
  
 
=== Plan ===
 
=== Plan ===
 
* Continue with Full target production.
 
* Continue with Full target production.
 
* Accelerator maintenance scheduled for Tuesday or Wednesday.
 
* Accelerator maintenance scheduled for Tuesday or Wednesday.

Revision as of 09:44, 10 November 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Thursday, November 10

Past 24 hours

  • No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.
  • Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.
  • Took production data on Full LHe target. Since yesterday we collected 1.0 B events.

Shift Summary

Issues/Reports

  • No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.
  • After the beam was back it was mostly stble besides some FSD trips.

Plan

  • Continue with Full target production.
  • Accelerator maintenance scheduled for Tuesday or Wednesday.