(Monday, November 14)
(Shift Summary)
Line 105: Line 105:
  
  
* [https://logbooks.jlab.org/entry/4080817 Day Nov 12 ]
+
* [https://logbooks.jlab.org/entry/4080817 Day Nov 13 ]
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 12]
+
* [https://logbooks.jlab.org/entry/4081076 Swing Nov 13]
* [https://logbooks.jlab.org/entry/4081215 Owl Nov12/13]
+
* [https://logbooks.jlab.org/entry/4081215 Owl Nov13/14]
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 13]
+
* [https://logbooks.jlab.org/entry/4081434 Early riser Nov 14]
  
 
=== Issues/Reports ===
 
=== Issues/Reports ===

Revision as of 14:14, 13 November 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Thursday, November 10

Past 24 hours

  • No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.
  • Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator were somewhat larger and lie outside the preferred range, monitoring PS rates.
  • Took production data on Full LHe target. Since yesterday we collected 1.0 B events.

Shift Summary

Issues/Reports

  • No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.
  • After the beam was back it was mostly stable besides some FSD trips.

Plan

  • Continue with Full target production.
  • Accelerator maintenance scheduled for Tuesday or Wednesday.

Friday, November 11

Past 24 hours

  • Since the beam was not converging as desired we asked accelerator people to tune beam optics for Hall D. After beam tuning MCC did harp scan followed by our harp scans. The sigma u, sigma y and sigma x fits look like they are converging at collimator (https://logbooks.jlab.org/entry/4080101), though sigma u, sigma y from radiator harp scan are still outside of the preferred range. The plan for now is to monitor PSC rates (https://logbooks.jlab.org/entry/4080753).
  • Took production data on Full LHe target. Since yesterday we collected 2.2 B events.

Shift Summary

Issues/Reports

  • MCC took away the beam from 16:36-18:55 to correct steering issues for delivering 70 uA beam to Hall C.
  • Beam energy distribution normalized to a previous run (110641) shows change in beam energy distribution (https://logbooks.jlab.org/entry/4080603). If this is not a problem we just need to update the reference plot.

Plan

  • Continue with Full target production.
  • Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.

Saturday, November 12

Past 24 hours

  • Took production data on LHe target. When the beam was gone we switched to empty target. After the beam was back Arshak did a Harp scan (https://logbooks.jlab.org/entry/4081290). PSC rate went up and the sigmas of x, u and y positions are now in preferred range.
  • The change in beam energy distribution normalized to a previous run (110641) is also back to normal (https://logbooks.jlab.org/entry/4081449).

Since yesterday we collected 1 B events.

Shift Summary

Issues/Reports

  • SRF Vacuum issues, Hall B Solenoid PS Failure. No beam from 14:29-23:04.
  • During owl shift DAQ event rate dropped because FADC250 in Slot 3 of the rocfcal4 crate was dead. Sergey disconnect FCALRoc4 from trigger to recover event rate to 17 kHz. Sasha replaced the FADC module in the morning (took around ~1h) and connected FCALRoc4 to the trigger. This wasn't critical for PrimEx since the this slot is at the edge of FCAL.
  • After connected FCALRoc4 to the trigger, Sash didn't succeed in running the script to include BCAL LED triggers, so he asked Mark to do it.

Plan

  • Started empty target production when the beam was back.
  • Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.

Sunday, November 13

Past 24 hours

  • Took production data with empty target.
  • Since yesterday we collected 1 B events.

Shift Summary

Issues/Reports

  • CDC bubbler BA901 is not bubbling, let Beni know.
  • BCAL LED triggers still off, checking with Mark about it.

Plan

  • Started empty target production when the beam was back.
  • Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.

Monday, November 14

Past 24 hours

  • Took production data with empty target.
  • Since yesterday we collected 1 B events.

Shift Summary

Issues/Reports

No beam from 10 am- due to problem with RF cavities.

Plan

  • Accelerator maintenance scheduled for Tuesday ~6:45 am, duration at list a shift and half.