# Reports: | # Reports: | ||
− | #* [https://logbooks.jlab.org/entry/3558945 | + | #* [https://logbooks.jlab.org/entry/3558945 Correlation between beam Y position and CDC HV current] (Beni) |
#* [https://logbooks.jlab.org/entry/3555238 Low Level Monitoring Report] | #* [https://logbooks.jlab.org/entry/3555238 Low Level Monitoring Report] | ||
# Run Plan | # Run Plan |
Revision as of 17:17, 11 April 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Contents
Thursday, April 12 at 08:45
- Notes from the previous 24 hours:
- TAC run
- Raw mode running while target is filling
- Production
- Issues:
- Reports:
- Run Plan
- Pass change this morning
- Short access to install copper and tungsten plates
- Production Running
- Pass change this morning
- AOB
Friday, April 13 at 08:45
- Notes from the previous 24 hours:
- Issues:
- Reports:
- Run Plan
- AOB