Difference between revisions of "Run Planning Meeting Notes, Apr12-Apr 18, 2018"
From GlueXWiki
(→Thursday, April 12 at 08:45) |
(→Thursday, April 12 at 08:45) |
||
Line 15: | Line 15: | ||
# Reports: | # Reports: | ||
#* [https://logbooks.jlab.org/entry/3558945 Correlation between beam Y position and CDC HV current] (Beni) | #* [https://logbooks.jlab.org/entry/3558945 Correlation between beam Y position and CDC HV current] (Beni) | ||
− | #* [https://logbooks.jlab.org/entry/ | + | #* [https://logbooks.jlab.org/entry/3559014 Attenuation lengths] (Lubomir) |
+ | #* [Low Level Monitoring Report] | ||
# Run Plan | # Run Plan | ||
#* Pass change this morning | #* Pass change this morning |
Revision as of 19:07, 11 April 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Contents
Thursday, April 12 at 08:45
- Notes from the previous 24 hours:
- TAC run (example strip chart)
- Raw mode running while target is filling
- Production
- Issues:
- Reports:
- Correlation between beam Y position and CDC HV current (Beni)
- Attenuation lengths (Lubomir)
- [Low Level Monitoring Report]
- Run Plan
- Pass change this morning
- Short access to install copper and tungsten plates
- Production Running
- Fast raster scan postponed to Monday
- Pass change this morning
- AOB
Friday, April 13 at 08:45
- Notes from the previous 24 hours:
- Issues:
- Reports:
- Run Plan
- AOB