Difference between revisions of "Run Planning Meeting Notes, Apr12-Apr 18, 2018"
From GlueXWiki
(→Thursday, April 12 at 08:45) |
(→Thursday, April 12 at 08:45) |
||
Line 17: | Line 17: | ||
#* [https://logbooks.jlab.org/entry/3559014 Attenuation lengths] (Lubomir) | #* [https://logbooks.jlab.org/entry/3559014 Attenuation lengths] (Lubomir) | ||
#* [https://logbooks.jlab.org/entry/3559057 PS acceptance from TAC run with 1/3 of data] (Sasha) | #* [https://logbooks.jlab.org/entry/3559057 PS acceptance from TAC run with 1/3 of data] (Sasha) | ||
− | #* [Low Level Monitoring Report] | + | #* [https://logbooks.jlab.org/entry/3559321 PS scalers] (Alexandre) |
+ | #* [https://logbooks.jlab.org/entry/3559309 Low Level Monitoring Report] | ||
# Run Plan | # Run Plan | ||
#* Pass change this morning | #* Pass change this morning |
Revision as of 08:14, 12 April 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Contents
Thursday, April 12 at 08:45
- Notes from the previous 24 hours:
- TAC run (evening strip chart) was finished around 10pm. Took data with both the 750um and 75um converter.
- Production started around 11 pm and has continued through the night.
- Issues:
- When adjusting a procedure, please contact the expert before doing so to make sure the changes you make are okay.
- ~1hr 20 mins of DAQ issues while the target was filling and we could not run in raw mode.
- Reports:
- Correlation between beam Y position and CDC HV current (Beni)
- Attenuation lengths (Lubomir)
- PS acceptance from TAC run with 1/3 of data (Sasha)
- PS scalers (Alexandre)
- Low Level Monitoring Report
- Run Plan
- Pass change this morning
- Short access to install copper and tungsten shields
- Production running
- Harp scan when beam comes back
- Fast raster scan postponed to Monday
- Any more systematic studies we want to do?
- Pass change this morning
- AOB
Friday, April 13 at 08:45
- Notes from the previous 24 hours:
- Issues:
- Reports:
- Run Plan
- AOB