Difference between revisions of "Run Planning Meeting Notes, Apr12-Apr 18, 2018"
From GlueXWiki
(→Thursday, April 12 at 08:45) |
(→Friday, April 13 at 08:45) |
||
Line 32: | Line 32: | ||
== Friday, April 13 at 08:45 == | == Friday, April 13 at 08:45 == | ||
# Notes from the previous 24 hours: | # Notes from the previous 24 hours: | ||
− | #* | + | #* [https://logbooks.jlab.org/entry/3559451 Muon chamber installed with the steel bar] |
+ | #* [https://logbooks.jlab.org/entry/3559446 New radiator on GEM TRD] | ||
+ | #* [https://logbooks.jlab.org/entry/3559412 Shields installed on profiler] | ||
#Issues: | #Issues: | ||
#* | #* | ||
# Reports: | # Reports: | ||
− | #* | + | #* |
# Run Plan | # Run Plan | ||
#* | #* |
Revision as of 11:55, 12 April 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Contents
Thursday, April 12 at 08:45
- Notes from the previous 24 hours:
- TAC run (evening strip chart) was finished around 10pm. Took data with both the 750um and 75um converter.
- Production started around 11 pm and has continued through the night.
- Issues:
- When adjusting a procedure, please contact the expert before doing so to make sure the changes you make are okay.
- ~1hr 20 mins of DAQ issues while the target was filling and we could not run in raw mode.
- PS scalers (Alexandre)
- Reports:
- Correlation between beam Y position and CDC HV current (Beni)
- Attenuation lengths (Lubomir)
- PS acceptance from TAC run with 1/3 of data (Sasha)
- Low Level Monitoring Report (Thomas)
- Run Plan
- Pass change this morning
- Short access to install copper and tungsten shields
- Move muon chamber back into beam line
- Production running
- Harp scan when beam comes back
- Fast raster scan postponed to Monday
- Any more systematic studies we want to do?
- Pass change this morning
- AOB
Friday, April 13 at 08:45
- Notes from the previous 24 hours:
- Issues:
- Reports:
- Run Plan
- AOB