Difference between revisions of "Run Planning Meeting Notes, Apr5-Apr 11, 2018"

From GlueXWiki
Jump to: navigation, search
(Thursday, April 5 at 08:45)
 
(10 intermediate revisions by 3 users not shown)
Line 23: Line 23:
 
#* TAC run using V-wire today (pending good AC lock)
 
#* TAC run using V-wire today (pending good AC lock)
 
#* Production Running
 
#* Production Running
 +
 
# AOB
 
# AOB
  
Line 66: Line 67:
 
#Issues:
 
#Issues:
 
#* Eugene and Elton are out of town. Beni is Hall leader
 
#* Eugene and Elton are out of town. Beni is Hall leader
#* [https://logbooks.jlab.org/entry/3555570 Multiple peaks in profiler (AC lock?)] (Hovanes)
+
#* [https://logbooks.jlab.org/entry/3556085 Pb Plate increases FDC current]
#* [https://logbooks.jlab.org/entry/3555625 BCAL Occupancy] (Elton)
+
#* [https://logbooks.jlab.org/entry/3556615 Hot FCAL channel causes increased trigger rate]
#* Hot channel in TAGH
+
 
# Reports:  
 
# Reports:  
#* [https://logbooks.jlab.org/entry/3555314 Rates with the 75 um and 750 um Be converters] (Alexandre)
+
#* [https://logbooks.jlab.org/entry/3557293 Low Level Monitoring Report] (Thomas)
#* [https://logbooks.jlab.org/entry/3555496 Calibration Updates] (Sean)
+
#* [https://logbooks.jlab.org/entry/3556052 Empty Target] (Simon)
#* [https://logbooks.jlab.org/entry/3555726 Low Level Monitoring Report] (Thomas)
+
#* [https://logbooks.jlab.org/entry/3556131 BCAL background]([https://logbooks.jlab.org/entry/3555910 hdview2])(Mark D.)
 +
#* [https://logbooks.jlab.org/entry/3556409 Transmission] and [https://logbooks.jlab.org/entry/3556424 Beam Energy](Alexandre)
 +
#* [https://logbooks.jlab.org/entry/3556975 Beam Convergence](Hovanes)
 +
#* [https://logbooks.jlab.org/entry/3557324 CDC Background] (Sergey)
 +
#* [https://docs.google.com/presentation/d/1cCeHChwz_VCfb73A23QacOxT-Hrnfhke0LQaCKlMNW0/edit?usp=sharing Synchotron Radiation in Gluex] (Richard)
 
# Run Plan
 
# Run Plan
#* Beam down for 2-4 hours for Hall-B pass change
+
#* Beam down 8hrs of Beam Studies
#* SSP (trigger studies) 1h (Sascha)
+
#** Install plates for shield scan
#* CODA 3.08 Test 1h (Sergey)
+
#* Fast raster beam characterization (4hr)
#* CDC Rate studies? (Lubomir)
+
#* Pre-AC shield scan (?)
 
#* Production Running
 
#* Production Running
 
# AOB
 
# AOB
  
 
== Tuesday, April 10 at 08:45 ==
 
== Tuesday, April 10 at 08:45 ==
 +
# Notes from the previous 24 hours:
 +
#* [https://logbooks.jlab.org/entry/3557401 Additional Shielding installed]
 +
#* [https://logbooks.jlab.org/entry/3557507 Abosrber Plates Installed]
 +
#* [https://logbooks.jlab.org/entry/3557645 Beam convergence re-tuned]
 +
#* Beam returned to us ~20:00. Mostly steady beam w/ production running overnight.
 +
# Issues:
 +
#* [https://logbooks.jlab.org/entry/3557431 W effect on AC] (Lubomir)
 +
#* [https://logbooks.jlab.org/entry/3557510 Glitches in Beam Energy Monitoring] (Alexandre)
 +
#* [https://logbooks.jlab.org/entry/3557699 CDC Noisy pre-amp] (Naomi)
 +
# Reports:
 +
#* [https://logbooks.jlab.org/entry/3557853 Low Level Monitoring Report] (Thomas)
 +
#* [https://logbooks.jlab.org/entry/3557458 BCAL point distributions] (Mark D.)
 +
#* [https://logbooks.jlab.org/entry/3557680 Material Scan Results] (Lubomir)
 +
#[https://halldweb.jlab.org/wiki/index.php/File:Spring18_week13.jpg Run Plan]
 +
#* Beam goes down for 4hrs of RF recovery at 9am
 +
#* Access List:
 +
#** Nick - CDC preamp replacement(?)
 +
#** Sasha, Chris - Tagger Hall ?
 +
#** Tim,Hovanes,? - Restore 1mm Pb plate
 +
#* TAC run
 +
#* [[Beam halo measurements to assess background for PRad target TAC runs.|PRad background test]]
 +
#* Production Running
 +
#* Trigger Studies (2hr) moved to Wed.
 +
#* Fast raster study (4hr) moved to Friday
 +
# AOB
 +
 
== Wednesday, April 11 at 08:45 ==
 
== Wednesday, April 11 at 08:45 ==
 +
# Notes from the previous 24 hours:
 +
#* Down for RF recovery most of day
 +
#* [https://logbooks.jlab.org/entry/3558003 1mm Pb plate restored on profiler (other plates removed)] (Mark S.)
 +
#* [https://logbooks.jlab.org/entry/3557988 Hot CDC preamp card replaced] (Nick)
 +
#* [https://logbooks.jlab.org/entry/3558212 New CDC and FDC baseline calibrations] (Beni)
 +
#* Beam returned ~16:00
 +
#* Radiator Thickness Studies ~6.5hr (spotty beam)
 +
#* Production Running overnight
 +
# Issues:
 +
#* Beam Convergence
 +
#** [https://logbooks.jlab.org/entry/3557934 Before RF recovery]
 +
#** [https://logbooks.jlab.org/entry/3558362 After RF recovery]
 +
#* [https://logbooks.jlab.org/entry/3558508 PS Coincidence Rate]
 +
# Reports:
 +
#* [https://logbooks.jlab.org/entry/3558636 Low Level Monitoring Report]
 +
#* [https://logbooks.jlab.org/entry/3558551 Automated Online Calibrations]
 +
#* Beamline
 +
#** [https://logbooks.jlab.org/entry/3558232 Collimation Functions] (Richard)
 +
#** [https://logbooks.jlab.org/entry/3558299 LPM Effect in Hall-D] (Richard)
 +
#** [https://logbooks.jlab.org/entry/3558669 Brem. Spectral Intensity] (Richard)
 +
#** [https://logbooks.jlab.org/entry/3558682 Rates/currents w/o Profiler, Al, Cu]
 +
#[https://halldweb.jlab.org/wiki/index.php/File:Spring18_week13.jpg Run Plan]
 +
#* TAC Run deferred until Friday morning
 +
#* Possibly hour of beam down ~13:00 or 13:30
 +
#* Production Running
 +
# AOB
 +
#* New Run Coordinator: Colin Gleason

Latest revision as of 17:19, 11 April 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Thursday, April 5 at 08:45

  1. Notes from the previous 24 hours:
    • Beam convergence adjustment by Todd
    • Beam issues off and on through Swing and Owl shifts
    • fADC125 module failure in FDC. Rapid access used by Sascha and Cody to replace.
    • Other DAQ issues ~1hr for swing + owl
  2. Issues:
    • Shift-takers should at least log any acknowledged alarms so that they are not forgotten
      • TAGH had few tripped channels with no alarm sounding
    • High Level monitoring plots look bad (calibrations)
    • Bubblers
  3. Reports:
  4. Run Plan
    • TAC run using V-wire today (pending good AC lock)
    • Production Running
  1. AOB

Friday, April 6 at 08:45

  1. Notes from the previous 24 hours:
    • Some issues getting stable beam through the day except for ~1hr over lunch
    • V-wire setup late afternoon
    • TAC run postponed
    • TAC/PS efficiency tests
    • Empty target and raw mode run
    • Production running overnight
    • Running until May 6 official.
    • 3 month down time likely
  2. Issues:
  3. Reports:
  4. Run Plan
    • Beam down for 2-4 hours for Hall-B pass change
    • SSP (trigger studies) 1h (Sascha)
    • CODA 3.08 Test 1h (Sergey)
    • CDC Rate studies? (Lubomir)
    • Production Running
  5. AOB

Saturday, April 7 at 10:00

--- NO MEETING ---

Sunday, April 8 at 10:00

--- NO MEETING ---

Monday, April 9 at 08:45

  1. Notes from the previous 72 hours:
    • Mostly stable beam over weekend
    • CDC Intensity scan completed Friday
    • Hot FCAL channel causing higher trigger rate Saturday lost ~5hr
    • Sensor failure in tagger dump on Sunday lost ~6.5hr
    • Some issues getting stable beam through the day except for ~1hr over lunch
  2. Issues:
  3. Reports:
  4. Run Plan
    • Beam down 8hrs of Beam Studies
      • Install plates for shield scan
    • Fast raster beam characterization (4hr)
    • Pre-AC shield scan (?)
    • Production Running
  5. AOB

Tuesday, April 10 at 08:45

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports:
  4. Run Plan
    • Beam goes down for 4hrs of RF recovery at 9am
    • Access List:
      • Nick - CDC preamp replacement(?)
      • Sasha, Chris - Tagger Hall ?
      • Tim,Hovanes,? - Restore 1mm Pb plate
    • TAC run
    • PRad background test
    • Production Running
    • Trigger Studies (2hr) moved to Wed.
    • Fast raster study (4hr) moved to Friday
  5. AOB

Wednesday, April 11 at 08:45

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports:
  4. Run Plan
    • TAC Run deferred until Friday morning
    • Possibly hour of beam down ~13:00 or 13:30
    • Production Running
  5. AOB
    • New Run Coordinator: Colin Gleason