Difference between revisions of "Run Planning Meeting Notes, Apr5-Apr 11, 2018"
From GlueXWiki
Line 29: | Line 29: | ||
#* Some issues getting stable beam through the day except for ~1hr over lunch | #* Some issues getting stable beam through the day except for ~1hr over lunch | ||
#* V-wire setup late afternoon | #* V-wire setup late afternoon | ||
− | #* TAC/PS efficiency tests | + | #* TAC run postponed |
− | #* | + | #* TAC/PS efficiency tests |
− | #* | + | #* Empty target and raw mode run |
− | #* | + | #* Production running overnight |
+ | #* Running until May 6 official. | ||
+ | #* 3 month down time likely | ||
#Issues: | #Issues: | ||
− | #* | + | #* [https://logbooks.jlab.org/entry/3555570 Multiple peaks in profiler (AC lock?)] (Hovanes) |
− | + | #* [https://logbooks.jlab.org/entry/3555625 BCAL Occupancy] (Elton) | |
− | + | #* Hot channel in TAGH | |
− | #* [https://logbooks.jlab.org/entry/ | + | |
# Reports: | # Reports: | ||
− | #* [https://logbooks.jlab.org/entry/ | + | #* [https://logbooks.jlab.org/entry/3555314 Rates with the 75 um and 750 um Be converters] (Alexandre) |
− | #* [https://logbooks.jlab.org/entry/ | + | #* [https://logbooks.jlab.org/entry/3555496 Calibration Updates] (Sean) |
+ | #* [https://logbooks.jlab.org/entry/3555726 Low Level Monitoring Report] (Thomas) | ||
# Run Plan | # Run Plan | ||
− | #* | + | #* Beam down for 2-4 hours for Hall-B pass change |
+ | #* SSP (trigger studies) 1h (Sascha) | ||
+ | #* CODA 3.08 Test 1h (Sergey) | ||
+ | #* CDC Rate studies? (Lubomir) | ||
#* Production Running | #* Production Running | ||
− | |||
− | |||
# AOB | # AOB | ||
Revision as of 08:28, 6 April 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Contents
Thursday, April 5 at 08:45
- Notes from the previous 24 hours:
- Beam convergence adjustment by Todd
- Beam issues off and on through Swing and Owl shifts
- fADC125 module failure in FDC. Rapid access used by Sascha and Cody to replace.
- Other DAQ issues ~1hr for swing + owl
- Issues:
- Shift-takers should at least log any acknowledged alarms so that they are not forgotten
- TAGH had few tripped channels with no alarm sounding
- High Level monitoring plots look bad (calibrations)
- Bubblers
- Shift-takers should at least log any acknowledged alarms so that they are not forgotten
- Reports:
- Run Plan
- TAC run using V-wire today (pending good AC lock)
- Production Running
- AOB
Friday, April 6 at 08:45
- Notes from the previous 24 hours:
- Some issues getting stable beam through the day except for ~1hr over lunch
- V-wire setup late afternoon
- TAC run postponed
- TAC/PS efficiency tests
- Empty target and raw mode run
- Production running overnight
- Running until May 6 official.
- 3 month down time likely
- Issues:
- Multiple peaks in profiler (AC lock?) (Hovanes)
- BCAL Occupancy (Elton)
- Hot channel in TAGH
- Reports:
- Rates with the 75 um and 750 um Be converters (Alexandre)
- Calibration Updates (Sean)
- Low Level Monitoring Report (Thomas)
- Run Plan
- Beam down for 2-4 hours for Hall-B pass change
- SSP (trigger studies) 1h (Sascha)
- CODA 3.08 Test 1h (Sergey)
- CDC Rate studies? (Lubomir)
- Production Running
- AOB
Saturday, April 7 at 10:00
--- NO MEETING ---