Difference between revisions of "Run Planning Meeting Notes, Apr5-Apr 11, 2018"

From GlueXWiki
Jump to: navigation, search
Line 29: Line 29:
 
#* Some issues getting stable beam through the day except for ~1hr over lunch
 
#* Some issues getting stable beam through the day except for ~1hr over lunch
 
#* V-wire setup late afternoon
 
#* V-wire setup late afternoon
#* TAC/PS efficiency tests  
+
#* TAC run postponed
#* Beam issues off and on through Swing and Owl shifts
+
#* TAC/PS efficiency tests
#* fADC125 module failure in FDC. Rapid access used by Sascha and Cody to replace.
+
#* Empty target and raw mode run
#* Other DAQ issues ~1hr for swing + owl
+
#* Production running overnight
 +
#* Running until May 6 official.  
 +
#* 3 month down time likely
 
#Issues:
 
#Issues:
#* Shift-takers should at least log any acknowledged alarms so that they are not forgotten
+
#* [https://logbooks.jlab.org/entry/3555570 Multiple peaks in profiler (AC lock?)] (Hovanes)
#** TAGH had few tripped channels with no alarm sounding
+
#* [https://logbooks.jlab.org/entry/3555625 BCAL Occupancy] (Elton)
#* High Level monitoring plots look bad (calibrations)
+
#* Hot channel in TAGH
#* [https://logbooks.jlab.org/entry/3555160 Bubblers]
+
 
# Reports:  
 
# Reports:  
#* [https://logbooks.jlab.org/entry/3555238 Low Level Monitoring Report]
+
#* [https://logbooks.jlab.org/entry/3555314 Rates with the 75 um and 750 um Be converters] (Alexandre)
#* [https://logbooks.jlab.org/entry/3554935 750 um Be]
+
#* [https://logbooks.jlab.org/entry/3555496 Calibration Updates] (Sean)
 +
#* [https://logbooks.jlab.org/entry/3555726 Low Level Monitoring Report] (Thomas)
 
# Run Plan
 
# Run Plan
#* TAC run using V-wire today (pending good AC lock)
+
#* Beam down for 2-4 hours for Hall-B pass change
 +
#* SSP (trigger studies) 1h (Sascha)
 +
#* CODA 3.08 Test 1h (Sergey)
 +
#* CDC Rate studies? (Lubomir)
 
#* Production Running
 
#* Production Running
3 month down period
 
run to may 6
 
 
# AOB
 
# AOB
  

Revision as of 08:28, 6 April 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Thursday, April 5 at 08:45

  1. Notes from the previous 24 hours:
    • Beam convergence adjustment by Todd
    • Beam issues off and on through Swing and Owl shifts
    • fADC125 module failure in FDC. Rapid access used by Sascha and Cody to replace.
    • Other DAQ issues ~1hr for swing + owl
  2. Issues:
    • Shift-takers should at least log any acknowledged alarms so that they are not forgotten
      • TAGH had few tripped channels with no alarm sounding
    • High Level monitoring plots look bad (calibrations)
    • Bubblers
  3. Reports:
  4. Run Plan
    • TAC run using V-wire today (pending good AC lock)
    • Production Running
  5. AOB

Friday, April 6 at 08:45

  1. Notes from the previous 24 hours:
    • Some issues getting stable beam through the day except for ~1hr over lunch
    • V-wire setup late afternoon
    • TAC run postponed
    • TAC/PS efficiency tests
    • Empty target and raw mode run
    • Production running overnight
    • Running until May 6 official.
    • 3 month down time likely
  2. Issues:
  3. Reports:
  4. Run Plan
    • Beam down for 2-4 hours for Hall-B pass change
    • SSP (trigger studies) 1h (Sascha)
    • CODA 3.08 Test 1h (Sergey)
    • CDC Rate studies? (Lubomir)
    • Production Running
  5. AOB

Saturday, April 7 at 10:00

--- NO MEETING ---

Sunday, April 8 at 10:00

Monday, April 9 at 08:45

Tuesday, April 10 at 08:45

Wednesday, April 11 at 08:45