Run Planning Meeting Notes, Apr5-Apr 11, 2018
From GlueXWiki
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Contents
Thursday, April 5 at 08:45
- Notes from the previous 24 hours:
- Beam convergence adjustment by Todd
- Beam issues off and on through Swing and Owl shifts
- fADC125 module failure in FDC. Rapid access used by Sascha and Cody to replace.
- Other DAQ issues ~1hr for swing + owl
- Issues:
- Shift-takers should at least log any acknowledged alarms so that they are not forgotten
- TAGH had few tripped channels with no alarm sounding
- High Level monitoring plots look bad (calibrations)
- Bubblers
- Shift-takers should at least log any acknowledged alarms so that they are not forgotten
- Reports:
- Run Plan
- TAC run using V-wire today (pending good AC lock)
- Production Running
- AOB
Friday, April 6 at 08:45
- Notes from the previous 24 hours:
- Some issues getting stable beam through the day except for ~1hr over lunch
- V-wire setup late afternoon
- TAC/PS efficiency tests
- Beam issues off and on through Swing and Owl shifts
- fADC125 module failure in FDC. Rapid access used by Sascha and Cody to replace.
- Other DAQ issues ~1hr for swing + owl
- Issues:
- Shift-takers should at least log any acknowledged alarms so that they are not forgotten
- TAGH had few tripped channels with no alarm sounding
- High Level monitoring plots look bad (calibrations)
- Bubblers
- Shift-takers should at least log any acknowledged alarms so that they are not forgotten
- Reports:
- Run Plan
- TAC run using V-wire today (pending good AC lock)
- Production Running
3 month down period run to may 6
- AOB
Saturday, April 7 at 10:00
--- NO MEETING ---