Difference between revisions of "Run Planning Meeting Notes, Apr 11 - Apr 17, 2019"
From GlueXWiki
(→Thursday, Apr. 11 at 08:45) |
(→Thursday, Apr. 11 at 08:45) |
||
Line 9: | Line 9: | ||
== Thursday, Apr. 11 at 08:45 == | == Thursday, Apr. 11 at 08:45 == | ||
− | + | # Notes from the past 24 hours | |
− | #*Continued running at 200nA on LHe Target. | + | ##*Continued running at 200nA on LHe Target. |
− | #*TBD triggers collected. | + | ##*TBD triggers collected. |
− | #*TBD Covered the emergency replacement for the Duck Hunter shift this morning. | + | ##*TBD Covered the emergency replacement for the Duck Hunter shift this morning. |
− | + | # Issues | |
− | #* Gradual decrease and increase in PSC scalar rate ([https://logbooks.jlab.org/entry/3677566 Logbook entry 3677566] and [https://logbooks.jlab.org/entry/3677654 Logbook entry 3677654]). | + | ##* Gradual decrease and increase in PSC scalar rate ([https://logbooks.jlab.org/entry/3677566 Logbook entry 3677566] and [https://logbooks.jlab.org/entry/3677654 Logbook entry 3677654]). |
3. Reports | 3. Reports |
Revision as of 16:56, 10 April 2019
- Run_Coordination_Meetings:Spring2019_Run
- PrimEx daily meeting
- PrimEx-η run plan
- Production runs, number of triggers
- Trigger counter
- To join via a Web Browser, go to the page https://bluejeans.com/660743227
Thursday, Apr. 11 at 08:45
- Notes from the past 24 hours
- Continued running at 200nA on LHe Target.
- TBD triggers collected.
- TBD Covered the emergency replacement for the Duck Hunter shift this morning.
- Issues
- Gradual decrease and increase in PSC scalar rate (Logbook entry 3677566 and Logbook entry 3677654).
3. Reports
4. Today Continue running production at 200nA, 10-4 Al LHe target. 5. Run Plan
- End of run period in 4 days.
6. AOB
Friday, Apr. 12 at 08:45
- Notes from the past 24 hours
- Issues
- Reports
- Today
- Run Plan
- AOB
Monday, Apr. 15 at 08:45
- Notes from the past 72 hours
- Issues
- Reports
- Today
- Run Plan
- AOB