Difference between revisions of "Run Planning Meeting Notes, Apr 11 - Apr 17, 2019"

From GlueXWiki
Jump to: navigation, search
(Thursday, Apr. 11 at 08:45)
(Thursday, Apr. 11 at 08:45)
Line 15: Line 15:
  
 
:2. Issues
 
:2. Issues
:*Gradual decrease and increase in PSC scalar rate ([https://logbooks.jlab.org/entry/3677566 Logbook entry 3677566] and [https://logbooks.jlab.org/entry/3677654 Logbook entry 3677654]).
+
:*Gradual decrease and increase in PSC scalar rate ([https://logbooks.jlab.org/entry/3677566 Logbook entry 3677566], [https://logbooks.jlab.org/entry/3677654 Logbook entry 3677654], and [https://logbooks.jlab.org/entry/3677703 Logbook entry 3677703]).
 
:
 
:
 
:3. Reports
 
:3. Reports

Revision as of 19:00, 10 April 2019

Thursday, Apr. 11 at 08:45

1. Notes from the past 24 hours
  • Continued running at 200nA on LHe Target.
  • TBD triggers collected.
  • Drew covered the emergency replacement for the Duck Hunter shift this morning.
2. Issues
3. Reports
4. Today
  • Continue running production at 200nA, 10-4 Al LHe target.
5. Run Plan
  • End of run period in 4 days.
6. AOB

Friday, Apr. 12 at 08:45

  1. Notes from the past 24 hours
  1. Issues
  1. Reports
  1. Today
  1. Run Plan
  1. AOB

Monday, Apr. 15 at 08:45

  1. Notes from the past 72 hours
  1. Issues
  1. Reports
  1. Today
  1. Run Plan
  1. AOB