Difference between revisions of "Run Planning Meeting Notes, Apr 11 - Apr 17, 2019"
From GlueXWiki
(→Thursday, Apr. 11 at 08:45) |
(→Thursday, Apr. 11 at 08:45) |
||
Line 10: | Line 10: | ||
== Thursday, Apr. 11 at 08:45 == | == Thursday, Apr. 11 at 08:45 == | ||
:1. Notes from the past 24 hours | :1. Notes from the past 24 hours | ||
− | *Continued running at 200nA on LHe Target. | + | :*Continued running at 200nA on LHe Target. |
− | *TBD triggers collected. | + | :*TBD triggers collected. |
− | *TBD Covered the emergency replacement for the Duck Hunter shift this morning. | + | :*TBD Covered the emergency replacement for the Duck Hunter shift this morning. |
:2. Issues | :2. Issues | ||
* Gradual decrease and increase in PSC scalar rate ([https://logbooks.jlab.org/entry/3677566 Logbook entry 3677566] and [https://logbooks.jlab.org/entry/3677654 Logbook entry 3677654]). | * Gradual decrease and increase in PSC scalar rate ([https://logbooks.jlab.org/entry/3677566 Logbook entry 3677566] and [https://logbooks.jlab.org/entry/3677654 Logbook entry 3677654]). | ||
− | + | : | |
:3. Reports | :3. Reports | ||
:4. Today | :4. Today | ||
− | Continue running production at 200nA, 10<sup>-4</sup> Al LHe target. | + | :*Continue running production at 200nA, 10<sup>-4</sup> Al LHe target. |
:5. Run Plan | :5. Run Plan | ||
− | *End of run period in 4 days. | + | :*End of run period in 4 days. |
:6. AOB | :6. AOB |
Revision as of 17:00, 10 April 2019
- Run_Coordination_Meetings:Spring2019_Run
- PrimEx daily meeting
- PrimEx-η run plan
- Production runs, number of triggers
- Trigger counter
- To join via a Web Browser, go to the page https://bluejeans.com/660743227
Thursday, Apr. 11 at 08:45
- 1. Notes from the past 24 hours
- Continued running at 200nA on LHe Target.
- TBD triggers collected.
- TBD Covered the emergency replacement for the Duck Hunter shift this morning.
- 2. Issues
- Gradual decrease and increase in PSC scalar rate (Logbook entry 3677566 and Logbook entry 3677654).
- 3. Reports
- 4. Today
- Continue running production at 200nA, 10-4 Al LHe target.
- 5. Run Plan
- End of run period in 4 days.
- 6. AOB
Friday, Apr. 12 at 08:45
- Notes from the past 24 hours
- Issues
- Reports
- Today
- Run Plan
- AOB
Monday, Apr. 15 at 08:45
- Notes from the past 72 hours
- Issues
- Reports
- Today
- Run Plan
- AOB