Difference between revisions of "Run Planning Meeting Notes, Apr 11 - Apr 17, 2019"

From GlueXWiki
Jump to: navigation, search
(Thursday, Apr. 11 at 08:45)
(Thursday, Apr. 11 at 08:45)
Line 24: Line 24:
 
:*Continue running production at 200nA, 10<sup>-4</sup> Al LHe target.
 
:*Continue running production at 200nA, 10<sup>-4</sup> Al LHe target.
 
:5. Run Plan
 
:5. Run Plan
:*End of run period in 4 days.
+
:*End of run period in 4 days, Monday 6AM beam off.
  
 
:6. AOB
 
:6. AOB

Revision as of 06:48, 11 April 2019

Thursday, Apr. 11 at 08:45

1. Notes from the past 24 hours
  • Continued running at 200nA on LHe Target.
  • 1.5B triggers collected.
  • MCC took away beam around 16:55 due to magnet issues, beam returned shortly after.
  • One DAQ crash in the evening around 21:00, Surgey was here at the time and corrected.
  • Drew covered the emergency replacement for the Duck Hunter shift this morning.
2. Issues
3. Reports
4. Today
  • Continue running production at 200nA, 10-4 Al LHe target.
5. Run Plan
  • End of run period in 4 days, Monday 6AM beam off.
6. AOB