Difference between revisions of "Run Planning Meeting Notes, Apr 11 - Apr 17, 2019"

From GlueXWiki
Jump to: navigation, search
(Thursday, Apr. 11 at 08:45)
(Thursday, Apr. 11 at 08:45)
Line 13: Line 13:
 
#*
 
#*
 
# Issues
 
# Issues
#* Gradual decrease and increase in PSC scalar rate ([https://logbooks.jlab.org/entry/3677566 Logbook entry 3677566] and [https://logbooks.jlab.org/entry/3677654 Logbook entry 3677654])
+
#* Gradual decrease and increase in PSC scalar rate ([https://logbooks.jlab.org/entry/3677566 Logbook entry 3677566] and [https://logbooks.jlab.org/entry/3677654 Logbook entry 3677654]).
  
 
# Reports
 
# Reports
  
 
# Today
 
# Today
 
+
Continue running production at 200nA, 10<sup>-4</sup> Al LHe target.
 
# Run Plan
 
# Run Plan
 +
#*End of run period in 4 days.
  
 
# AOB
 
# AOB

Revision as of 16:27, 10 April 2019

Thursday, Apr. 11 at 08:45

  1. Notes from the past 24 hours
    • Continued running at 200nA on LHe Target.
  2. Issues
  1. Reports
  1. Today

Continue running production at 200nA, 10-4 Al LHe target.

  1. Run Plan
    • End of run period in 4 days.
  1. AOB

Friday, Apr. 12 at 08:45

  1. Notes from the past 24 hours
  1. Issues
  1. Reports
  1. Today
  1. Run Plan
  1. AOB

Monday, Apr. 15 at 08:45

  1. Notes from the past 72 hours
  1. Issues
  1. Reports
  1. Today
  1. Run Plan
  1. AOB