Difference between revisions of "Run Planning Meeting Notes, Apr 11 - Apr 17, 2019"

From GlueXWiki
Jump to: navigation, search
(Thursday, Apr. 11 at 08:45)
(Thursday, Apr. 11 at 08:45)
Line 10: Line 10:
 
== Thursday, Apr. 11 at 08:45 ==
 
== Thursday, Apr. 11 at 08:45 ==
 
# Notes from the past 24 hours
 
# Notes from the past 24 hours
##*Continued running at 200nA on LHe Target.
+
#*Continued running at 200nA on LHe Target.
##*TBD triggers collected.
+
#*TBD triggers collected.
##*TBD Covered the emergency replacement for the Duck Hunter shift this morning.
+
#*TBD Covered the emergency replacement for the Duck Hunter shift this morning.
  
 
# Issues
 
# Issues
##* Gradual decrease and increase in PSC scalar rate ([https://logbooks.jlab.org/entry/3677566 Logbook entry 3677566] and [https://logbooks.jlab.org/entry/3677654 Logbook entry 3677654]).
+
#* Gradual decrease and increase in PSC scalar rate ([https://logbooks.jlab.org/entry/3677566 Logbook entry 3677566] and [https://logbooks.jlab.org/entry/3677654 Logbook entry 3677654]).
  
 
3. Reports
 
3. Reports

Revision as of 16:58, 10 April 2019

Thursday, Apr. 11 at 08:45

  1. Notes from the past 24 hours
    • Continued running at 200nA on LHe Target.
    • TBD triggers collected.
    • TBD Covered the emergency replacement for the Duck Hunter shift this morning.
  1. Issues

3. Reports

4. Today Continue running production at 200nA, 10-4 Al LHe target. 5. Run Plan

    • End of run period in 4 days.

6. AOB

Friday, Apr. 12 at 08:45

  1. Notes from the past 24 hours
  1. Issues
  1. Reports
  1. Today
  1. Run Plan
  1. AOB

Monday, Apr. 15 at 08:45

  1. Notes from the past 72 hours
  1. Issues
  1. Reports
  1. Today
  1. Run Plan
  1. AOB