Difference between revisions of "Run Planning Meeting Notes, Apr 11 - Apr 17, 2019"

From GlueXWiki
Jump to: navigation, search
(Thursday, Apr. 11 at 08:45)
(Thursday, Apr. 11 at 08:45)
Line 12: Line 12:
 
:*Continued running at 200nA on LHe Target.
 
:*Continued running at 200nA on LHe Target.
 
:*TBD triggers collected.
 
:*TBD triggers collected.
 +
:*MCC took away beam around 16:55 due to magnet issues, beam returned shortly after.
 +
:*One DAQ crash in the evening around 21:00, Surgey was here at the time and corrected.
 
:*Drew covered the emergency replacement for the Duck Hunter shift this morning.
 
:*Drew covered the emergency replacement for the Duck Hunter shift this morning.
  

Revision as of 05:25, 11 April 2019

Thursday, Apr. 11 at 08:45

1. Notes from the past 24 hours
  • Continued running at 200nA on LHe Target.
  • TBD triggers collected.
  • MCC took away beam around 16:55 due to magnet issues, beam returned shortly after.
  • One DAQ crash in the evening around 21:00, Surgey was here at the time and corrected.
  • Drew covered the emergency replacement for the Duck Hunter shift this morning.
2. Issues
3. Reports
4. Today
  • Continue running production at 200nA, 10-4 Al LHe target.
5. Run Plan
  • End of run period in 4 days.
6. AOB

Friday, Apr. 12 at 08:45

  1. Notes from the past 24 hours
  1. Issues
  1. Reports
  1. Today
  1. Run Plan
  1. AOB

Monday, Apr. 15 at 08:45

  1. Notes from the past 72 hours
  1. Issues
  1. Reports
  1. Today
  1. Run Plan
  1. AOB