(Thursday, Apr. 11 at 08:45)
(Thursday, Apr. 11 at 08:45)
Line 20: Line 20:
 
:
 
:
 
:3. Reports
 
:3. Reports
 
+
:*Rate drop yesterday ([https://logbooks.jlab.org/entry/3677875 Logbook entry 3677875]).
 
:4. Today
 
:4. Today
 
:*Continue running production at 200nA, 10<sup>-4</sup> Al LHe target.
 
:*Continue running production at 200nA, 10<sup>-4</sup> Al LHe target.

Revision as of 08:14, 11 April 2019

Thursday, Apr. 11 at 08:45

1. Notes from the past 24 hours
  • Continued running at 200nA on LHe Target.
  • 1.63B triggers collected.
  • MCC took away beam around 16:55 due to magnet issues, beam returned shortly after.
  • One DAQ crash in the evening around 21:00, Surgey was here at the time and corrected.
  • Drew covered the emergency replacement for the Duck Hunter shift this morning.
2. Issues
3. Reports
4. Today
  • Continue running production at 200nA, 10-4 Al LHe target.
5. Run Plan
  • End of run period in 4 days, Monday 6AM beam off.
6. AOB