(Friday, Apr. 12 at 08:45)
(Friday, Apr. 12 at 08:45)
Line 44: Line 44:
  
 
:4. Today
 
:4. Today
:*Continue running production at 200nA, 10<sup>-4</sup> Al LHe target.
+
:*Continue running production at 50nA, 10<sup>-4</sup> Al LHe target. Turn on the forward drift chamber.
 
:5. Run Plan
 
:5. Run Plan
 
:*End of run period in 3 days, Monday 6AM beam off.
 
:*End of run period in 3 days, Monday 6AM beam off.
  
 
:6. AOB
 
:6. AOB

Revision as of 17:18, 11 April 2019

Thursday, Apr. 11 at 08:45

1. Notes from the past 24 hours
  • Continued running at 200nA on LHe Target.
  • 1.63B triggers collected.
  • MCC took away beam around 16:55 due to magnet issues, beam returned shortly after.
  • One DAQ crash in the evening around 21:00, Surgey was here at the time and corrected.
  • Drew covered the emergency replacement for the Duck Hunter shift this morning.
2. Issues
3. Reports
4. Today
  • Continue running production at 200nA, 10-4 Al LHe target.
5. Run Plan
  • End of run period in 4 days, Monday 6AM beam off.
6. AOB

Friday, Apr. 12 at 08:45

1. Notes from the past 24 hours
  • Continued running at 200nA on LHe Target.
  • Accelerator experienced hardware issues and required access to replace a power supply, the beam was gone between 10:00 and 14:00 (Logbook entry 3677960).
  • TBA triggers collected.
2. Issues
3. Reports
  • Rate drop on Wednesday, continuing discussion,
4. Today
  • Continue running production at 50nA, 10-4 Al LHe target. Turn on the forward drift chamber.
5. Run Plan
  • End of run period in 3 days, Monday 6AM beam off.
6. AOB