(Thursday, April 19 at 08:45)
Line 9: Line 9:
 
# Notes from the previous 24 hours:
 
# Notes from the previous 24 hours:
 
#* [https://logbooks.jlab.org/entry/3562938 Convergence was adjusted]
 
#* [https://logbooks.jlab.org/entry/3562938 Convergence was adjusted]
#*  Production running
 
 
#* [https://logbooks.jlab.org/entry/3563138 Current scan completed]
 
#* [https://logbooks.jlab.org/entry/3563138 Current scan completed]
#* Production started around 11 pm and has continued through the night.
+
#* Production running
 
#Issues:
 
#Issues:
 
# Reports:
 
# Reports:
 
#* [https://logbooks.jlab.org/entry/3562987 Results from material scan] (Sergey and Lubomir)
 
#* [https://logbooks.jlab.org/entry/3562987 Results from material scan] (Sergey and Lubomir)
#* [https://logbooks.jlab.org/entry/ ] ()
+
#* Results from thin diamond,  3.4 mm hole. [https://logbooks.jlab.org/entry/3562976 FDC currents drop, not CDC] [https://logbooks.jlab.org/entry/3562958 PS flux comparison ]
#* [https://logbooks.jlab.org/entry/ ] ()
+
#* First results from current scan [https://logbooks.jlab.org/entry/https://logbooks.jlab.org/entry/3563226] [https://logbooks.jlab.org/entry/3563244] [https://logbooks.jlab.org/entry/3563162]
#* [https://logbooks.jlab.org/entry/ ] ()
+
#* [https://logbooks.jlab.org/entry/3562880 CDC current correlation with Y beam position observed again] (Beni)
#* [https://logbooks.jlab.org/entry/ ] ()
+
#* [https://logbooks.jlab.org/entry/ ] ()
+
 
# Run Plan
 
# Run Plan
 
#* Access today to  
 
#* Access today to  

Revision as of 08:39, 19 April 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Thursday, April 19 at 08:45

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports:
  4. Run Plan
    • Access today to
      • Move active collimator to 5 mm hole
      • Attach Pb radiator to profiler
      • Muon chamber inspection
    • Production running
      • Harp scan when beam comes back
    • Fast raster scan deferred until the required people can be found
    • Future studies
      • High rate trigger studies