# Notes from the weekend:
 
# Notes from the weekend:
#* Production running
+
#* Production running (~80 % ABU)
 
# Reports:
 
# Reports:
 
#* [https://logbooks.jlab.org/entry/3564054 Raster scan commissioning]  Todd: "we are ready for a test with AC DAQ running"
 
#* [https://logbooks.jlab.org/entry/3564054 Raster scan commissioning]  Todd: "we are ready for a test with AC DAQ running"
#* [https://logbooks.jlab.org/entry/3563853 First collimator scan had issues], [https://logbooks.jlab.org/entry/3564074 Follow up more successful], [https://logbooks.jlab.org/entry/3564002  active target], [https://logbooks.jlab.org/entry/3564090 Total PS rate]
+
#* [https://logbooks.jlab.org/entry/3563853 First collimator scan had issues], [https://logbooks.jlab.org/entry/3564074 Follow up more successful], [https://logbooks.jlab.org/entry/3564002  active target], [https://logbooks.jlab.org/entry/3564090 Total PS rate]
 +
#* [https://logbooks.jlab.org/entry/3564954 Coherent edge excursions
 
# Issues:
 
# Issues:
 
#* RCDB issues [https://logbooks.jlab.org/entry/3564038],  
 
#* RCDB issues [https://logbooks.jlab.org/entry/3564038],  
 +
#* [https://logbooks.jlab.org/entry/3565217 Multiple DAQ crashes]
 +
#* [https://logbooks.jlab.org/entry/3565056 Goniometer vertical stage tripped again]
 +
#* Harp scans done in CW [https://logbooks.jlab.org/entry/3565198] [https://logbooks.jlab.org/entry/3565199], we must ask for 1 uA CW.  [https://halldweb.jlab.org/hdops/wiki/index.php/Beam_Line_Detectors_Shift#Accelerator_Harp_Scan New paragraph added to shift worker instructions]
 
# Run Plan
 
# Run Plan
#* High rate tests Monday
+
#* Monday
#* Production running
+
#** Beam studies today, parasitic beam possible.
 +
#** High rate L1 tests  
 +
#** High rates test of new CODA version
 +
#** Production running
 +
#* Tuesday
 +
#** RF recovery
 +
#** Muon chamber removal
 
#* Longer term run plan
 
#* Longer term run plan
 
#** [https://halldweb.jlab.org/wiki/images/f/fb/Spring18_week15.jpg weekly plan]
 
#** [https://halldweb.jlab.org/wiki/images/f/fb/Spring18_week15.jpg weekly plan]

Revision as of 08:41, 23 April 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Monday, April 22 at 08:45

  1. Notes from the weekend:
    • Production running (~80 % ABU)
  2. Reports:
  3. Issues:
  4. Run Plan
    • Monday
      • Beam studies today, parasitic beam possible.
      • High rate L1 tests
      • High rates test of new CODA version
      • Production running
    • Tuesday
      • RF recovery
      • Muon chamber removal
    • Longer term run plan
  5. AOB

Friday, April 20 at 08:45

  1. Notes from the previous 24 hours:
  2. Reports:
  3. Issues
  4. Run Plan
    • High rate tests this afternoon
    • Production running
    • Fast raster scan deferred until Monday (probably, will hear from PD)
    • Longer term run plan
  5. AOB

Thursday, April 19 at 08:45

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports:
  4. Run Plan
    • Access today to
      • Move active collimator to 5 mm hole
      • Attach Pb radiator to profiler
      • Muon chamber inspection
    • Production running
      • Harp scan when beam comes back
    • Fast raster scan deferred until the required people can be found
    • Future studies
  5. AOB