Difference between revisions of "Run Planning Meeting Notes, Apr 19-Apr 25, 2018"

From GlueXWiki
Jump to: navigation, search
(Monday, April 22 at 08:45)
(Monday, April 22 at 08:45)
Line 17: Line 17:
 
#* [https://logbooks.jlab.org/entry/3565217 Multiple DAQ crashes]
 
#* [https://logbooks.jlab.org/entry/3565217 Multiple DAQ crashes]
 
#* [https://logbooks.jlab.org/entry/3565056 Goniometer vertical stage tripped again]
 
#* [https://logbooks.jlab.org/entry/3565056 Goniometer vertical stage tripped again]
#* Harp scans done in CW [https://logbooks.jlab.org/entry/3565198] [https://logbooks.jlab.org/entry/3565199], we must ask for 1 uA CW.  [https://halldweb.jlab.org/hdops/wiki/index.php/Beam_Line_Detectors_Shift#Accelerator_Harp_Scan New paragraph added to shift worker instructions]
+
#* Harp scans done in CW [https://logbooks.jlab.org/entry/3565198] [https://logbooks.jlab.org/entry/3565199], we must ask for 1 uA Tune Mode.  [https://halldweb.jlab.org/hdops/wiki/index.php/Beam_Line_Detectors_Shift#Accelerator_Harp_Scan New paragraph added to shift worker instructions]
 
# Run Plan
 
# Run Plan
 
#* Monday
 
#* Monday

Revision as of 08:56, 23 April 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Monday, April 22 at 08:45

  1. Notes from the weekend:
    • Production running (~80 % ABU)
  2. Reports:
  3. Issues:
  4. Run Plan
    • Monday
      • Beam studies today, parasitic beam possible.
      • High rate L1 tests
      • High rates test of new CODA version
      • Production running
    • Tuesday
      • RF recovery
      • Muon chamber removal
    • Longer term run plan
  5. AOB

Friday, April 20 at 08:45

  1. Notes from the previous 24 hours:
  2. Reports:
  3. Issues
  4. Run Plan
    • High rate tests this afternoon
    • Production running
    • Fast raster scan deferred until Monday (probably, will hear from PD)
    • Longer term run plan
  5. AOB

Thursday, April 19 at 08:45

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports:
  4. Run Plan
    • Access today to
      • Move active collimator to 5 mm hole
      • Attach Pb radiator to profiler
      • Muon chamber inspection
    • Production running
      • Harp scan when beam comes back
    • Fast raster scan deferred until the required people can be found
    • Future studies
  5. AOB