(Wednesday, April 25 at 08:45)
(Wednesday, April 25 at 08:45)
 
(One intermediate revision by the same user not shown)
Line 19: Line 19:
 
#*** Survey 9:00 am
 
#*** Survey 9:00 am
 
#*** Tour 10:10 am to 11:00 am 40 people.
 
#*** Tour 10:10 am to 11:00 am 40 people.
 +
#*** High rate testing L1 trigger stability.  FDC thresholds. 
 +
#*** Swing low current testing with Mike Mc
 
#* Thursday
 
#* Thursday
#** TAC run
+
#** Production
 
#* Friday
 
#* Friday
#** High rate DAQ tests??
+
#** 9:30 High rate DAQ tests
 +
#** 12:00 TAC run
 
#* Longer term run plan
 
#* Longer term run plan
 
#** [https://halldweb.jlab.org/wiki/images/f/fb/Spring18_week15.jpg weekly plan]
 
#** [https://halldweb.jlab.org/wiki/images/f/fb/Spring18_week15.jpg weekly plan]
 
#** High luminosity data taking (~500 nA) ~100 M triggers and some minutes raw mode
 
#** High luminosity data taking (~500 nA) ~100 M triggers and some minutes raw mode
 +
# Fall Running
 +
#* GlueX until 20 October then installation
 +
#* Low energy after 18 November (10.3 GeV then 9 GeV)
 +
#** DIRC checkout
 +
#** PrimEx commissioning
 
# AOB
 
# AOB
  

Latest revision as of 09:24, 25 April 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Wednesday, April 25 at 08:45

  1. Notes from previous 24 hours:
  2. Reports:
  3. Issues:
    • DAQ issues during day and swing shift [1], [2]
  4. Run Plan
    • Wednesday
      • Tour of Hall D. Restricted access.
        • Survey 9:00 am
        • Tour 10:10 am to 11:00 am 40 people.
        • High rate testing L1 trigger stability. FDC thresholds.
        • Swing low current testing with Mike Mc
    • Thursday
      • Production
    • Friday
      • 9:30 High rate DAQ tests
      • 12:00 TAC run
    • Longer term run plan
      • weekly plan
      • High luminosity data taking (~500 nA) ~100 M triggers and some minutes raw mode
  5. Fall Running
    • GlueX until 20 October then installation
    • Low energy after 18 November (10.3 GeV then 9 GeV)
      • DIRC checkout
      • PrimEx commissioning
  6. AOB

Tuesday, April 24 at 08:45

  1. Notes from previous 24 hours:
    • High rate L1 tests
    • First data taking with AC raster scan
    • Production running
  2. Reports:
  3. Issues:
  4. Run Plan
    • Tuesday
      • RF recovery Access
        • Muon chamber removal
        • Walk through
        • Change basses
        • Add lead to profiler
      • Empty target run
      • Raw (full waveform) mode running while target filling
      • Production
    • Wednesday
      • Tour of Hall D. Restricted access. 10:10 am 40 people.
    • Thursday
      • TAC run
    • Longer term run plan
      • weekly plan
      • Super high current (~500 nA) Raw mode and
  5. AOB

Monday, April 23 at 08:45

  1. Notes from the weekend:
    • Production running (~80 % ABU)
  2. Reports:
  3. Issues:
  4. Run Plan
    • Monday
      • Beam studies today, parasitic beam possible.
      • High rate L1 tests
      • High rates test of new CODA version
      • Production running
      • Raster scan
    • Tuesday
      • RF recovery
      • Muon chamber removal
      • Walk through
      • Change basses
      • Add lead to profiler
    • Wednesday
      • Tour of Hall D. Restricted access. 10:10 am 40 people.
    • Thursday
      • TAC run
    • Longer term run plan
      • weekly plan
      • Super high current (~500 nA) Raw mode and
  5. AOB

Friday, April 20 at 08:45

  1. Notes from the previous 24 hours:
  2. Reports:
  3. Issues
  4. Run Plan
    • High rate tests this afternoon
    • Production running
    • Fast raster scan deferred until Monday (probably, will hear from PD)
    • Longer term run plan
  5. AOB

Thursday, April 19 at 08:45

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports:
  4. Run Plan
    • Access today to
      • Move active collimator to 5 mm hole
      • Attach Pb radiator to profiler
      • Muon chamber inspection
    • Production running
      • Harp scan when beam comes back
    • Fast raster scan deferred until the required people can be found
    • Future studies
  5. AOB