Difference between revisions of "Run Planning Meeting Notes, Apr 19-Apr 25, 2018"

From GlueXWiki
Jump to: navigation, search
(Thursday, April 19 at 08:45)
Line 5: Line 5:
 
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar]
 
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar]
 
* [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar]
 
* [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar]
 +
 +
== Friday, April 20 at 08:45 ==
 +
# Notes from the previous 24 hours:
 +
#* [https://logbooks.jlab.org/entry/3563497 Moved AC to 5 mm hole, installed 100 um W shield]
 +
#* Production running
 +
# Reports:
 +
# Issues
 +
#* [https://logbooks.jlab.org/entry/3563798 Issues with BCAL timing?] (Elton)
 +
# Run Plan
 +
#* High rate tests this afternoon
 +
#* Production running
 +
#* Fast raster scan deferred until Monday (probably, will hear from PD)
 +
#* Longer term run plan
 +
#** [https://halldweb.jlab.org/wiki/images/f/fb/Spring18_week15.jpg weekly plan]
 +
# AOB
 +
  
 
== Thursday, April 19 at 08:45 ==
 
== Thursday, April 19 at 08:45 ==

Revision as of 08:31, 20 April 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Friday, April 20 at 08:45

  1. Notes from the previous 24 hours:
  2. Reports:
  3. Issues
  4. Run Plan
    • High rate tests this afternoon
    • Production running
    • Fast raster scan deferred until Monday (probably, will hear from PD)
    • Longer term run plan
  5. AOB


Thursday, April 19 at 08:45

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports:
  4. Run Plan
    • Access today to
      • Move active collimator to 5 mm hole
      • Attach Pb radiator to profiler
      • Muon chamber inspection
    • Production running
      • Harp scan when beam comes back
    • Fast raster scan deferred until the required people can be found
    • Future studies
  5. AOB