Difference between revisions of "Run Planning Meeting Notes, Apr 19-Apr 25, 2018"

From GlueXWiki
Jump to: navigation, search
(Friday, April 20 at 08:45)
Line 5: Line 5:
 
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar]
 
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar]
 
* [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar]
 
* [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar]
 +
 +
== Monday, April 22 at 08:45 ==
 +
# Notes from the weekend:
 +
#* Production running
 +
# Reports:
 +
#* [https://logbooks.jlab.org/entry/3564054 Raster scan commissioning]  Todd: "we are ready for a test with AC DAQ running"
 +
#* [https://logbooks.jlab.org/entry/3563853 First collimator scan had issues], [https://logbooks.jlab.org/entry/3564074 Follow up more successful], [https://logbooks.jlab.org/entry/3564002  active target], [https://logbooks.jlab.org/entry/3564090 Total PS rate]
 +
# Issues:
 +
#* RCDB issues [https://logbooks.jlab.org/entry/3564038],
 +
# Run Plan
 +
#* High rate tests Monday
 +
#* Production running
 +
#* Longer term run plan
 +
#** [https://halldweb.jlab.org/wiki/images/f/fb/Spring18_week15.jpg weekly plan]
 +
# AOB
  
 
== Friday, April 20 at 08:45 ==
 
== Friday, April 20 at 08:45 ==

Revision as of 14:14, 21 April 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Monday, April 22 at 08:45

  1. Notes from the weekend:
    • Production running
  2. Reports:
  3. Issues:
    • RCDB issues [1],
  4. Run Plan
    • High rate tests Monday
    • Production running
    • Longer term run plan
  5. AOB

Friday, April 20 at 08:45

  1. Notes from the previous 24 hours:
  2. Reports:
  3. Issues
  4. Run Plan
    • High rate tests this afternoon
    • Production running
    • Fast raster scan deferred until Monday (probably, will hear from PD)
    • Longer term run plan
  5. AOB

Thursday, April 19 at 08:45

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports:
  4. Run Plan
    • Access today to
      • Move active collimator to 5 mm hole
      • Attach Pb radiator to profiler
      • Muon chamber inspection
    • Production running
      • Harp scan when beam comes back
    • Fast raster scan deferred until the required people can be found
    • Future studies
  5. AOB