Difference between revisions of "Run Planning Meeting Notes, Apr 26-May 2, 2018"

From GlueXWiki
Jump to: navigation, search
m
m
Line 12: Line 12:
 
#Issues:
 
#Issues:
 
#* Resuming DAQ after Wednesday tour
 
#* Resuming DAQ after Wednesday tour
 +
#* Running with 750 um converter
 
# Reports:
 
# Reports:
 
# Run Plan
 
# Run Plan
 
#*Thursday
 
#*Thursday
 +
#**Level 1 trigger test
 +
#**High rate trigger test part II(?)
 
#**Low current BPM test (afternoon)
 
#**Low current BPM test (afternoon)
 
#*Friday
 
#*Friday

Revision as of 22:03, 25 April 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Thursday, April 26 at 08:45

  1. Notes from the previous 24 hours:
    • Production running
    • High rate trigger tests
  2. Issues:
    • Resuming DAQ after Wednesday tour
    • Running with 750 um converter
  3. Reports:
  4. Run Plan
    • Thursday
      • Level 1 trigger test
      • High rate trigger test part II(?)
      • Low current BPM test (afternoon)
    • Friday
      • High rate DAQ tests (9.30 am)
      • TAC Run (12 pm)
    • Saturday
    • Longer term run plan
  5. AOB