Difference between revisions of "Run Planning Meeting Notes, Apr 26-May 2, 2018"

From GlueXWiki
Jump to: navigation, search
m
m
 
(30 intermediate revisions by 3 users not shown)
Line 5: Line 5:
 
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar]
 
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar]
 
* [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar]
 
* [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar]
 +
 +
== Wednesday, May 2 at 08:45 ==
 +
# Notes from previous 24 hours:
 +
#* Production running
 +
#* Raster scan now working [https://logbooks.jlab.org/entry/3570432]
 +
#* MCC harp scans seem to be fine [https://logbooks.jlab.org/entry/3570199]
 +
# Issues:
 +
# Reports:
 +
#* ρ polarization with 17um diamond and 3.2mm collimator: [https://logbooks.jlab.org/entry/3570238], [https://logbooks.jlab.org/entry/3570445]
 +
# Run Plan
 +
#*Wednesday
 +
#**RF recovery
 +
#**12 GeV Dedication Tour
 +
#** Access to uninstall muon chamber
 +
#*Thursday
 +
#**TAC Run
 +
#** Raster Scan
 +
#*Friday
 +
#**Production Running
 +
#*Longer term run plan/Other items
 +
#**Access to remove plate from beam profiler
 +
#*End of run preparation
 +
#**Be prepared to switch off after last beam at 6 am, SUNDAY May 6
 +
#**Shutdown list
 +
#**Detectors
 +
#***FCal [https://logbooks.jlab.org/entry/3570357]
 +
# AOB
 +
 +
== Tuesday, May 1 at 08:45 ==
 +
# Notes from previous 24 hours:
 +
#* Accesses during beam studies
 +
#** TOF HV [https://logbooks.jlab.org/entry/3569616]
 +
#** Muon Chamber [https://logbooks.jlab.org/entry/3569789]
 +
#** FCal bases [https://logbooks.jlab.org/entry/3569816]
 +
#* Resuming production running
 +
#* MCC harp scans should be in tune mode
 +
# Issues:
 +
#* High-Level Monitoring [https://logbooks.jlab.org/entry/3569757]
 +
#* Occupancies in tagger monitoring [https://logbooks.jlab.org/entry/3570058]
 +
# Reports:
 +
# Run Plan
 +
#*Tuesday
 +
#**Production Running
 +
#**Raster Scan Studies
 +
#*Wednesday
 +
#**RF recovery
 +
#**12 GeV Inauguration(!) Tour
 +
#** Access to uninstall muon chamber
 +
#*Thursday
 +
#**TAC Run
 +
#*Longer term run plan/Other items
 +
#**[https://halldweb.jlab.org/wiki/images/5/5f/Spring18_week16.jpg]
 +
#*End of run preparation
 +
#**Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6
 +
#**Shutdown list
 +
# AOB
 +
 +
== Monday, April 30 at 08:45 ==
 +
# Notes from the weekend:
 +
#* Production running
 +
#* Vertical beam position [https://logbooks.jlab.org/entry/3568673][https://logbooks.jlab.org/entry/3568692][https://logbooks.jlab.org/entry/3568687]
 +
#* Monitoring Plots [https://logbooks.jlab.org/entry/3569584]
 +
#Issues:
 +
#* TOF voltage failure [https://logbooks.jlab.org/entry/3569587]
 +
#* Gluon49 failure
 +
#* Open Door
 +
# Reports:
 +
#* Coherent Edge Fading [https://logbooks.jlab.org/entry/3568752][https://logbooks.jlab.org/entry/3568844][https://logbooks.jlab.org/entry/3568892][https://logbooks.jlab.org/entry/3568939]
 +
# Run Plan
 +
#*Monday
 +
#**Beam studies
 +
#**Accesses
 +
#***TOF
 +
#***FCal
 +
#***Muon Chamber
 +
#*Tuesday
 +
#**RF recovery (moved to Wednesday)
 +
#*Wednesday
 +
#**12 GeV Inauguration(!) Tour
 +
#**TAC Run (Move to Thursday?)
 +
#*Longer term run plan/Other items
 +
#**Resumption of raster scan studies
 +
#*End of run preparation
 +
#**Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6
 +
# AOB
 +
 +
== Sunday, April 29 - No Meeting ==
 +
 +
== Saturday, April 28 - No Meeting ==
  
 
== Friday, April 27 at 08:45 ==
 
== Friday, April 27 at 08:45 ==
 
# Notes from the previous 24 hours:
 
# Notes from the previous 24 hours:
 
#* Production running
 
#* Production running
#* BCal Pedestals [https://logbooks.jlab.org/entry/3567716]
+
#* BCal Pedestals [https://logbooks.jlab.org/entry/3567716][https://logbooks.jlab.org/entry/3568018]
 
#*Low current BPM lock test [https://logbooks.jlab.org/entry/3567770][https://logbooks.jlab.org/entry/3567767][https://logbooks.jlab.org/entry/3567763][https://logbooks.jlab.org/entry/3567761]
 
#*Low current BPM lock test [https://logbooks.jlab.org/entry/3567770][https://logbooks.jlab.org/entry/3567767][https://logbooks.jlab.org/entry/3567763][https://logbooks.jlab.org/entry/3567761]
 
#Issues:
 
#Issues:
 
#* Rootspy crashes and recovery [https://logbooks.jlab.org/entry/3567623][https://logbooks.jlab.org/entry/3567838]
 
#* Rootspy crashes and recovery [https://logbooks.jlab.org/entry/3567623][https://logbooks.jlab.org/entry/3567838]
#* Running with 750 um converter
+
#* Time differences in monitoring plots [https://logbooks.jlab.org/entry/3567859]
 
# Reports:
 
# Reports:
 +
#* High intensity DAQ tests [https://logbooks.jlab.org/entry/3568068]
 +
#* Running with 750 um converter [https://logbooks.jlab.org/entry/3568067]
 +
#** [https://docs.google.com/presentation/d/1nosxQB76tMsh6tiTRi-2B7UbXwqNE4ksdQ3w2ic6rhg/edit?usp=sharing TPOL runtime estimate] - ''R. Jones''
 
# Run Plan
 
# Run Plan
 
#*Friday
 
#*Friday
 
#**High rate DAQ tests (9.30 am)
 
#**High rate DAQ tests (9.30 am)
 
#**Injector recovery (MCC, possible beam down ~1hr)
 
#**Injector recovery (MCC, possible beam down ~1hr)
#**TAC Run (2 pm)
+
#**Level 1 trigger studies
 
#*Saturday
 
#*Saturday
 
#**Production Running
 
#**Production Running
Line 26: Line 118:
 
#*Longer term run plan/Other items
 
#*Longer term run plan/Other items
 
#**Resumption of raster scan studies
 
#**Resumption of raster scan studies
#**Level 1 trigger studies
+
#**Access for Muon detector
 +
#**Tour
 +
#**TAC Run (Wednesday)
 
#*End of run preparation
 
#*End of run preparation
 
#**Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6
 
#**Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6

Latest revision as of 08:40, 2 May 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Wednesday, May 2 at 08:45

  1. Notes from previous 24 hours:
    • Production running
    • Raster scan now working [1]
    • MCC harp scans seem to be fine [2]
  2. Issues:
  3. Reports:
    • ρ polarization with 17um diamond and 3.2mm collimator: [3], [4]
  4. Run Plan
    • Wednesday
      • RF recovery
      • 12 GeV Dedication Tour
      • Access to uninstall muon chamber
    • Thursday
      • TAC Run
      • Raster Scan
    • Friday
      • Production Running
    • Longer term run plan/Other items
      • Access to remove plate from beam profiler
    • End of run preparation
      • Be prepared to switch off after last beam at 6 am, SUNDAY May 6
      • Shutdown list
      • Detectors
  5. AOB

Tuesday, May 1 at 08:45

  1. Notes from previous 24 hours:
    • Accesses during beam studies
    • Resuming production running
    • MCC harp scans should be in tune mode
  2. Issues:
    • High-Level Monitoring [9]
    • Occupancies in tagger monitoring [10]
  3. Reports:
  4. Run Plan
    • Tuesday
      • Production Running
      • Raster Scan Studies
    • Wednesday
      • RF recovery
      • 12 GeV Inauguration(!) Tour
      • Access to uninstall muon chamber
    • Thursday
      • TAC Run
    • Longer term run plan/Other items
    • End of run preparation
      • Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6
      • Shutdown list
  5. AOB

Monday, April 30 at 08:45

  1. Notes from the weekend:
  2. Issues:
    • TOF voltage failure [16]
    • Gluon49 failure
    • Open Door
  3. Reports:
  4. Run Plan
    • Monday
      • Beam studies
      • Accesses
        • TOF
        • FCal
        • Muon Chamber
    • Tuesday
      • RF recovery (moved to Wednesday)
    • Wednesday
      • 12 GeV Inauguration(!) Tour
      • TAC Run (Move to Thursday?)
    • Longer term run plan/Other items
      • Resumption of raster scan studies
    • End of run preparation
      • Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6
  5. AOB

Sunday, April 29 - No Meeting

Saturday, April 28 - No Meeting

Friday, April 27 at 08:45

  1. Notes from the previous 24 hours:
  2. Issues:
    • Rootspy crashes and recovery [27][28]
    • Time differences in monitoring plots [29]
  3. Reports:
  4. Run Plan
    • Friday
      • High rate DAQ tests (9.30 am)
      • Injector recovery (MCC, possible beam down ~1hr)
      • Level 1 trigger studies
    • Saturday
      • Production Running
    • Sunday
      • Production Running
    • Longer term run plan/Other items
      • Resumption of raster scan studies
      • Access for Muon detector
      • Tour
      • TAC Run (Wednesday)
    • End of run preparation
      • Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6
  5. AOB

Thursday, April 26 at 08:45

  1. Notes from the previous 24 hours:
    • Replacement of TAGH FDC module [32]
    • Production running
    • High rate trigger tests
  2. Issues:
    • Resuming DAQ after Wednesday tour [33]
    • Running with 750 um converter
    • Hot Channels, delta t offsets [34]
  3. Reports:
  4. Run Plan
    • Thursday
      • Level 1 trigger test
      • High rate trigger test part II(?)
      • Low current BPM lock test (afternoon)
    • Friday
      • High rate DAQ tests (9.30 am)
      • TAC Run (2 pm)
    • Saturday
    • Longer term run plan
  5. AOB