<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Thursday, April 26 at 08:45

  1. Notes from the previous 24 hours:
    • Production running
    • High rate trigger tests
  2. Issues:
    • Resuming DAQ after Wednesday tour
  3. Reports:
  4. Run Plan
    • Thursday
      • Low current BPM test (afternoon)
    • Friday
      • High rate DAQ tests (9.30 am)
      • TAC Run (12 pm)
    • Saturday
    • Longer term run plan
  5. AOB