Difference between revisions of "Run Planning Meeting Notes, Apr 26-May 2, 2018"

From GlueXWiki
Jump to: navigation, search
m
Line 5: Line 5:
 
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar]
 
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar]
 
* [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar]
 
* [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar]
 +
 +
== Friday, April 27 at 08:45 ==
 +
# Notes from the previous 24 hours:
 +
#* Production running
 +
#Issues:
 +
#* Running with 750 um converter
 +
#* Raster Scan
 +
# Reports:
 +
# Run Plan
 +
#*Friday
 +
#**High rate DAQ tests (9.30 am)
 +
#**TAC Run (2 pm)
 +
#*Saturday
 +
#**Production Running
 +
#*Sunday
 +
#**Production Running
 +
#*Longer term run plan
 +
#**Resumption of raster scan studies
 +
#*End of run preparation
 +
#**Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6
 +
# AOB
  
 
== Thursday, April 26 at 08:45 ==
 
== Thursday, April 26 at 08:45 ==

Revision as of 09:56, 26 April 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Friday, April 27 at 08:45

  1. Notes from the previous 24 hours:
    • Production running
  2. Issues:
    • Running with 750 um converter
    • Raster Scan
  3. Reports:
  4. Run Plan
    • Friday
      • High rate DAQ tests (9.30 am)
      • TAC Run (2 pm)
    • Saturday
      • Production Running
    • Sunday
      • Production Running
    • Longer term run plan
      • Resumption of raster scan studies
    • End of run preparation
      • Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6
  5. AOB

Thursday, April 26 at 08:45

  1. Notes from the previous 24 hours:
    • Replacement of TAGH FDC module [1]
    • Production running
    • High rate trigger tests
  2. Issues:
    • Resuming DAQ after Wednesday tour [2]
    • Running with 750 um converter
    • Hot Channels, delta t offsets [3]
  3. Reports:
  4. Run Plan
    • Thursday
      • Level 1 trigger test
      • High rate trigger test part II(?)
      • Low current BPM lock test (afternoon)
    • Friday
      • High rate DAQ tests (9.30 am)
      • TAC Run (2 pm)
    • Saturday
    • Longer term run plan
  5. AOB