# Notes from the weekend:
 
# Notes from the weekend:
 
#* Production running
 
#* Production running
#* Vertical beam position
+
#* Vertical beam position [https://logbooks.jlab.org/entry/3568673][https://logbooks.jlab.org/entry/3568692][https://logbooks.jlab.org/entry/3568687]
#* Monitoring Plots
+
#* Monitoring Plots [https://logbooks.jlab.org/entry/3569584]
 
#Issues:
 
#Issues:
#* TOF voltage failure
+
#* TOF voltage failure [https://logbooks.jlab.org/entry/3569587]
 
#* Gluon49 failure
 
#* Gluon49 failure
 
#* Open Door
 
#* Open Door

Revision as of 11:56, 30 April 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Monday, April 30 at 08:45

  1. Notes from the weekend:
    • Production running
    • Vertical beam position [1][2][3]
    • Monitoring Plots [4]
  2. Issues:
    • TOF voltage failure [5]
    • Gluon49 failure
    • Open Door
  3. Reports:
  4. Run Plan
    • Monday
      • Beam studies
      • Accesses
        • TOF
        • FCal
        • Muon Chamber
    • Tuesday
      • RF recovery (moved to Wednesday)
    • Wednesday
      • 12 GeV Inauguration(!) Tour
      • TAC Run (Move to Thursday?)
    • Longer term run plan/Other items
      • Resumption of raster scan studies
    • End of run preparation
      • Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6
  5. AOB

Sunday, April 29 - No Meeting

Saturday, April 28 - No Meeting

Friday, April 27 at 08:45

  1. Notes from the previous 24 hours:
  2. Issues:
    • Rootspy crashes and recovery [16][17]
    • Time differences in monitoring plots [18]
  3. Reports:
  4. Run Plan
    • Friday
      • High rate DAQ tests (9.30 am)
      • Injector recovery (MCC, possible beam down ~1hr)
      • Level 1 trigger studies
    • Saturday
      • Production Running
    • Sunday
      • Production Running
    • Longer term run plan/Other items
      • Resumption of raster scan studies
      • Access for Muon detector
      • Tour
      • TAC Run (Wednesday)
    • End of run preparation
      • Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6
  5. AOB

Thursday, April 26 at 08:45

  1. Notes from the previous 24 hours:
    • Replacement of TAGH FDC module [21]
    • Production running
    • High rate trigger tests
  2. Issues:
    • Resuming DAQ after Wednesday tour [22]
    • Running with 750 um converter
    • Hot Channels, delta t offsets [23]
  3. Reports:
  4. Run Plan
    • Thursday
      • Level 1 trigger test
      • High rate trigger test part II(?)
      • Low current BPM lock test (afternoon)
    • Friday
      • High rate DAQ tests (9.30 am)
      • TAC Run (2 pm)
    • Saturday
    • Longer term run plan
  5. AOB