Difference between revisions of "Run Planning Meeting Notes, Apr 4 - Apr 10, 2019"

From GlueXWiki
Jump to: navigation, search
(Created page with "__TOC__ * Run_Coordination_Meetings:Spring2019_Run * [https://halldweb.jlab.org/wiki/index.php/Spring_2019_Daily_Meetings PrimEx daily meeting] * [https://halldweb.jlab.o...")
 
Line 11: Line 11:
 
# Notes from the past 24 hours
 
# Notes from the past 24 hours
 
#* Accesses
 
#* Accesses
 +
#* MCC reported minor issues with RF separators last evening
 
# Issues
 
# Issues
 
#* [https://logbooks.jlab.org/entry/3675212 CCAL HV module replacement], [https://logbooks.jlab.org/entry/3675148 previuos (good) run might be affected, periodical autoreset of occupancy plots could help]
 
#* [https://logbooks.jlab.org/entry/3675212 CCAL HV module replacement], [https://logbooks.jlab.org/entry/3675148 previuos (good) run might be affected, periodical autoreset of occupancy plots could help]
 
#* [https://logbooks.jlab.org/entry/3675258 DAQ rates scaler still frozen], [https://logbooks.jlab.org/entry/3675272 DAQ rates scaler back after restarting trig_client]
 
#* [https://logbooks.jlab.org/entry/3675258 DAQ rates scaler still frozen], [https://logbooks.jlab.org/entry/3675272 DAQ rates scaler back after restarting trig_client]
 
# Reports
 
# Reports
 +
#* [https://logbooks.jlab.org/entry/3675433 Rate monitoring]
 +
#* [https://logbooks.jlab.org/entry/3675448 beam energy monitoring]
 +
#* [https://logbooks.jlab.org/entry/3675240 AC y signal decay follow up]
 
# Today
 
# Today
 
#* Production running, 200nA, 10<sup>-4</sup> Al
 
#* Production running, 200nA, 10<sup>-4</sup> Al
 
# Run Plan
 
# Run Plan
 +
#* Beam studies on Monday full 8 hrs. RF recovery if needed.
 
#* End of run in two weeks time...
 
#* End of run in two weeks time...
 
# AOB
 
# AOB

Revision as of 08:23, 4 April 2019

Thursday, Apr. 4 at 08:45

  1. Notes from the past 24 hours
    • Accesses
    • MCC reported minor issues with RF separators last evening
  2. Issues
  3. Reports
  4. Today
    • Production running, 200nA, 10-4 Al
  5. Run Plan
    • Beam studies on Monday full 8 hrs. RF recovery if needed.
    • End of run in two weeks time...
  6. AOB