(Thursday, Apr. 4 at 08:45)
Line 26: Line 26:
 
#* Beam studies on Monday full 8 hrs. RF recovery if needed.
 
#* Beam studies on Monday full 8 hrs. RF recovery if needed.
 
#* End of run in two weeks time...
 
#* End of run in two weeks time...
 +
# AOB
 +
 +
== Friday, Apr. 5 at 08:45 ==
 +
# Notes from the past 24 hours
 +
#* MCC reported issues with RF separators during the day shift (about 2 hours with no beam)
 +
#* Collected more than 1.6B triggers on full target
 +
# Issues
 +
#* No FP trigger bit 6 since Wednesday's access ([https://logbooks.jlab.org/entry/3675468  logbook entry 3675468]). Fixed at 10:30 ([https://logbooks.jlab.org/entry/3675508 logbook entry 3675508]).
 +
# Reports
 +
#* AC y signal decay under beam follow up ([https://logbooks.jlab.org/entry/3675518 logbook entry 3675518]).
 +
#* Convectron vacuum gauges alarms removed ([https://logbooks.jlab.org/entry/3675593 logbook entry 3675593]).
 +
# Today
 +
#* Production running, 200nA, 10<sup>-4</sup> Al
 +
# Run Plan
 +
#* Beam studies on Monday, the whole day shift. RF recovery only if needed.
 +
#* End of run in 10 days
 
# AOB
 
# AOB

Revision as of 20:23, 4 April 2019

Thursday, Apr. 4 at 08:45

  1. Notes from the past 24 hours
  2. Issues
  3. Reports
  4. Today
    • Production running, 200nA, 10-4 Al
  5. Run Plan
    • Beam studies on Monday full 8 hrs. RF recovery if needed.
    • End of run in two weeks time...
  6. AOB

Friday, Apr. 5 at 08:45

  1. Notes from the past 24 hours
    • MCC reported issues with RF separators during the day shift (about 2 hours with no beam)
    • Collected more than 1.6B triggers on full target
  2. Issues
  3. Reports
  4. Today
    • Production running, 200nA, 10-4 Al
  5. Run Plan
    • Beam studies on Monday, the whole day shift. RF recovery only if needed.
    • End of run in 10 days
  6. AOB