Difference between revisions of "Run Planning Meeting Notes, Apr 4 - Apr 10, 2019"

From GlueXWiki
Jump to: navigation, search
(Friday, Apr. 5 at 08:45)
(Friday, Apr. 5 at 08:45)
Line 31: Line 31:
 
# Notes from the past 24 hours
 
# Notes from the past 24 hours
 
#* MCC reported issues with RF separators during the day shift (about 2 hours with no beam)
 
#* MCC reported issues with RF separators during the day shift (about 2 hours with no beam)
#* Collected more than 1.3B triggers on full target
+
#* Collected more than 1.5B triggers on full target
 
# Issues
 
# Issues
 
#* No FP trigger bit 6 since Wednesday's access ([https://logbooks.jlab.org/entry/3675468  logbook entry 3675468]). Fixed at 10:30 ([https://logbooks.jlab.org/entry/3675508 logbook entry 3675508]).
 
#* No FP trigger bit 6 since Wednesday's access ([https://logbooks.jlab.org/entry/3675468  logbook entry 3675468]). Fixed at 10:30 ([https://logbooks.jlab.org/entry/3675508 logbook entry 3675508]).

Revision as of 08:43, 5 April 2019

Thursday, Apr. 4 at 08:45

  1. Notes from the past 24 hours
  2. Issues
  3. Reports
  4. Today
    • Production running, 200nA, 10-4 Al
  5. Run Plan
    • Beam studies on Monday full 8 hrs. RF recovery if needed.
    • End of run in two weeks time...
  6. AOB

Friday, Apr. 5 at 08:45

  1. Notes from the past 24 hours
    • MCC reported issues with RF separators during the day shift (about 2 hours with no beam)
    • Collected more than 1.5B triggers on full target
  2. Issues
  3. Reports
  4. Today
    • Production running, 200nA, 10-4 Al
  5. Run Plan
    • Beam studies on Monday, the whole day shift. RF recovery only if needed.
    • End of run in 10 days
  6. AOB
    • Next RC meeting on Monday