Difference between revisions of "Run Planning Meeting Notes, Apr 4 - Apr 10, 2019"

From GlueXWiki
Jump to: navigation, search
(Monday, Apr. 8 at 08:45)
(Monday, Apr. 8 at 08:45)
Line 51: Line 51:
 
# Issues
 
# Issues
 
#* Few FCAL basses are off or have low voltages ([https://logbooks.jlab.org/entry/3676530 logbook entry 3676530]). For later runs the situation looks better (rebooted?) ([https://logbooks.jlab.org/entry/3676636 logbook entry 3676636]). Voltages continue fluctuating ([https://logbooks.jlab.org/entry/3676649 logbook entry 3676649]). Colin will check.
 
#* Few FCAL basses are off or have low voltages ([https://logbooks.jlab.org/entry/3676530 logbook entry 3676530]). For later runs the situation looks better (rebooted?) ([https://logbooks.jlab.org/entry/3676636 logbook entry 3676636]). Voltages continue fluctuating ([https://logbooks.jlab.org/entry/3676649 logbook entry 3676649]). Colin will check.
 +
#* CCAL low occupancy spot appears from time to time (https://logbooks.jlab.org/entry/3676519 logbook entry 3676519)
 
#* AC beam position was unstable for a couple of hours (https://logbooks.jlab.org/entry/3676632 logbook entry 3676632)
 
#* AC beam position was unstable for a couple of hours (https://logbooks.jlab.org/entry/3676632 logbook entry 3676632)
 
# Reports
 
# Reports

Revision as of 08:39, 8 April 2019

Thursday, Apr. 4 at 08:45

  1. Notes from the past 24 hours
  2. Issues
  3. Reports
  4. Today
    • Production running, 200nA, 10-4 Al
  5. Run Plan
    • Beam studies on Monday full 8 hrs. RF recovery if needed.
    • End of run in two weeks time...
  6. AOB

Friday, Apr. 5 at 08:45

  1. Notes from the past 24 hours
    • MCC reported issues with RF separators during the day shift (about 2 hours with no beam)
    • Collected more than 1.5B triggers on full target
  2. Issues
  3. Reports
  4. Today
    • Production running, 200nA, 10-4 Al
  5. Run Plan
    • Beam studies on Monday, the whole day shift. RF recovery only if needed.
    • End of run in 10 days
  6. AOB
    • Next RC meeting on Monday


Monday, Apr. 8 at 08:45

  1. Notes from the past 72 hours
    • Collected more than 4.5B triggers on full target
  2. Issues
  3. Reports
  4. Today
    • Controlled access during the day shift
    • Target emptying this morning.
    • Walkthrough at 11:00 am
    • Production running, 200nA, 10-4 Al on Empty target evening and owl shifts.
  5. Run Plan
    • Beam studies 8:30 - 15:30, beam restoration 15:30-16:30. No RF recovery planned for Tuesday.
    • End of run in 7 days
  6. AOB