Difference between revisions of "Run Planning Meeting Notes, Apr 4 - Apr 10, 2019"

From GlueXWiki
Jump to: navigation, search
(Tuesday, Apr. 9 at 08:45)
(Tuesday, Apr. 9 at 08:45)
Line 78: Line 78:
 
#* Beam convergence ([https://logbooks.jlab.org/entry/3677034 logbook entry 3677034]).
 
#* Beam convergence ([https://logbooks.jlab.org/entry/3677034 logbook entry 3677034]).
 
#* Harp scan after beam restoration ([https://logbooks.jlab.org/entry/3677028 logbook entry 3677028], [https://logbooks.jlab.org/entry/3677019], [https://logbooks.jlab.org/entry/3677022])
 
#* Harp scan after beam restoration ([https://logbooks.jlab.org/entry/3677028 logbook entry 3677028], [https://logbooks.jlab.org/entry/3677019], [https://logbooks.jlab.org/entry/3677022])
 +
#* Rate monitoring ([https://logbooks.jlab.org/entry/3677186])
 
# Today
 
# Today
 
#* Controlled access afternoon to fill target back
 
#* Controlled access afternoon to fill target back

Revision as of 08:43, 9 April 2019

Thursday, Apr. 4 at 08:45

  1. Notes from the past 24 hours
  2. Issues
  3. Reports
  4. Today
    • Production running, 200nA, 10-4 Al
  5. Run Plan
    • Beam studies on Monday full 8 hrs. RF recovery if needed.
    • End of run in two weeks time...
  6. AOB

Friday, Apr. 5 at 08:45

  1. Notes from the past 24 hours
    • MCC reported issues with RF separators during the day shift (about 2 hours with no beam)
    • Collected more than 1.5B triggers on full target
  2. Issues
  3. Reports
  4. Today
    • Production running, 200nA, 10-4 Al
  5. Run Plan
    • Beam studies on Monday, the whole day shift. RF recovery only if needed.
    • End of run in 10 days
  6. AOB
    • Next RC meeting on Monday


Monday, Apr. 8 at 08:45

  1. Notes from the past 72 hours
    • Collected more than 4.5B triggers on full target
  2. Issues
  3. Reports
  4. Today
    • Controlled access during the day shift
    • Target emptying this morning.
    • Walkthrough at 11:00 am
    • Production running, 200nA, 10-4 Al on Empty target evening and owl shifts.
  5. Run Plan
    • Beam studies 8:30 - 15:30, beam restoration 15:30-16:30. No RF recovery planned for Tuesday.
    • End of run in 7 days
  6. AOB


Tuesday, Apr. 9 at 08:45

  1. Notes from the past 24 hours
    • Beam studies during last day shift. Target emptied.
    • Collected ~300M triggers on Empty target
  2. Issues
  3. Reports
  4. Today
    • Controlled access afternoon to fill target back
    • Production running, 200nA, 10-4 Al on Empty target before noon and full target afternoon.
  5. Run Plan
    • No RF recovery planned for today.
    • End of run in 6 days
  6. AOB