(Thursday, Apr. 4 at 08:45)
(Friday, Apr. 5 at 08:45)
Line 43: Line 43:
 
#* End of run in 10 days
 
#* End of run in 10 days
 
# AOB
 
# AOB
 +
#* Next RC meeting on Monday

Revision as of 08:36, 5 April 2019

Thursday, Apr. 4 at 08:45

  1. Notes from the past 24 hours
  2. Issues
  3. Reports
  4. Today
    • Production running, 200nA, 10-4 Al
  5. Run Plan
    • Beam studies on Monday full 8 hrs. RF recovery if needed.
    • End of run in two weeks time...
  6. AOB

Friday, Apr. 5 at 08:45

  1. Notes from the past 24 hours
    • MCC reported issues with RF separators during the day shift (about 2 hours with no beam)
    • Collected more than 1.3B triggers on full target
  2. Issues
  3. Reports
  4. Today
    • Production running, 200nA, 10-4 Al
  5. Run Plan
    • Beam studies on Monday, the whole day shift. RF recovery only if needed.
    • End of run in 10 days
  6. AOB
    • Next RC meeting on Monday