(Friday, Apr. 5 at 08:45)
Line 44: Line 44:
 
# AOB
 
# AOB
 
#* Next RC meeting on Monday
 
#* Next RC meeting on Monday
 +
 +
 +
== Monday, Apr. 8 at 08:45 ==
 +
# Notes from the past 72 hours
 +
#* Collected more than 4B triggers on full target
 +
# Issues
 +
#* Few FCAL basses are off or have low voltages (https://logbooks.jlab.org/entry/3676530 logbook entry 3676530). Colin will fix the problem.
 +
#* AC beam position was unstable for a couple of hours (https://logbooks.jlab.org/entry/3676632 logbook entry 3676632)
 +
# Reports
 +
#* Beam energy correlation with Hall C beam ([https://logbooks.jlab.org/entry/3676522 logbook entry 3676522]).
 +
# Today
 +
#* Controlled access during the day shift
 +
#* Target emptying this morning.
 +
#* Walkthrough at 11:00 am
 +
#* Production running, 200nA, 10<sup>-4</sup> Al on Empty target
 +
# Run Plan
 +
#* Beam studies on Monday, the whole day shift. RF recovery only if needed.
 +
#* End of run in 7 days
 +
# AOB

Revision as of 00:43, 8 April 2019

Thursday, Apr. 4 at 08:45

  1. Notes from the past 24 hours
  2. Issues
  3. Reports
  4. Today
    • Production running, 200nA, 10-4 Al
  5. Run Plan
    • Beam studies on Monday full 8 hrs. RF recovery if needed.
    • End of run in two weeks time...
  6. AOB

Friday, Apr. 5 at 08:45

  1. Notes from the past 24 hours
    • MCC reported issues with RF separators during the day shift (about 2 hours with no beam)
    • Collected more than 1.5B triggers on full target
  2. Issues
  3. Reports
  4. Today
    • Production running, 200nA, 10-4 Al
  5. Run Plan
    • Beam studies on Monday, the whole day shift. RF recovery only if needed.
    • End of run in 10 days
  6. AOB
    • Next RC meeting on Monday


Monday, Apr. 8 at 08:45

  1. Notes from the past 72 hours
    • Collected more than 4B triggers on full target
  2. Issues
  3. Reports
  4. Today
    • Controlled access during the day shift
    • Target emptying this morning.
    • Walkthrough at 11:00 am
    • Production running, 200nA, 10-4 Al on Empty target
  5. Run Plan
    • Beam studies on Monday, the whole day shift. RF recovery only if needed.
    • End of run in 7 days
  6. AOB