(Monday, Apr. 8 at 08:45)
(Monday, Apr. 8 at 08:45)
Line 58: Line 58:
 
#* Target emptying this morning.
 
#* Target emptying this morning.
 
#* Walkthrough at 11:00 am
 
#* Walkthrough at 11:00 am
#* Production running, 200nA, 10<sup>-4</sup> Al on Empty target
+
#* Production running, 200nA, 10<sup>-4</sup> Al on Empty target evening and owl shifts.
 
# Run Plan
 
# Run Plan
 
#* Beam studies on Monday, the whole day shift. RF recovery only if needed.
 
#* Beam studies on Monday, the whole day shift. RF recovery only if needed.
 
#* End of run in 7 days
 
#* End of run in 7 days
 
# AOB
 
# AOB

Revision as of 00:49, 8 April 2019

Thursday, Apr. 4 at 08:45

  1. Notes from the past 24 hours
  2. Issues
  3. Reports
  4. Today
    • Production running, 200nA, 10-4 Al
  5. Run Plan
    • Beam studies on Monday full 8 hrs. RF recovery if needed.
    • End of run in two weeks time...
  6. AOB

Friday, Apr. 5 at 08:45

  1. Notes from the past 24 hours
    • MCC reported issues with RF separators during the day shift (about 2 hours with no beam)
    • Collected more than 1.5B triggers on full target
  2. Issues
  3. Reports
  4. Today
    • Production running, 200nA, 10-4 Al
  5. Run Plan
    • Beam studies on Monday, the whole day shift. RF recovery only if needed.
    • End of run in 10 days
  6. AOB
    • Next RC meeting on Monday


Monday, Apr. 8 at 08:45

  1. Notes from the past 72 hours
    • Collected more than 4B triggers on full target
  2. Issues
  3. Reports
  4. Today
    • Controlled access during the day shift
    • Target emptying this morning.
    • Walkthrough at 11:00 am
    • Production running, 200nA, 10-4 Al on Empty target evening and owl shifts.
  5. Run Plan
    • Beam studies on Monday, the whole day shift. RF recovery only if needed.
    • End of run in 7 days